Laserfiche WebLink
fNSPECTION REPORT - "�� <br />Address –.C���P_—C.:�y�s��LT�, <br />Contractor_ ___._ � <br />�Qwner �( _��Q.Q� _ <br />Date O��l� --- <br />%�-;4PPROVAL � � PARTIAL APPROVAI_ <br />J VIOLATIO�I �� � CORRECTION REQUESTED <br />��tions listed beiow MUST BE MADE belore work can be approved. <br />� Please contact inspector and arrange lor appointment. <br />� Was not abte lo perform inspection. <br />� CALL 259•8D70 POR REINSPECTION -- 24 hour notice required <br />A CERTIFICATE UF OCCUPANCY SHALL �E ISSUED AND POSTED <br />ON TI�E PREMIS[S PRIOR TO OCCUPANCY. <br />Inspector <br />J Temp. El�ct. J aming � <br />_I Footmg �rywall, Nailinc� � <br />J Founda�ion J Shear Nailing <br />J Ductwork J Grid <br />J Wood Stove J Rough-in <br />J Masonry <br />?�DG: Pmt. No,�„1_��� J MECH: Pml. No <br />J ELEC: Pml. No.— U PL�G: Pmt. No. <br />Date <br />.�"Gas Piping <br />J Consul�ahon <br />J Groundwork <br />J SlrucL Slab <br />J Final <br />J Insulation <br />°r <br />