Laserfiche WebLink
�PISPECTION REPORT <br />Address SZP� %�`.. ,"� � r� N _ <br />Contractor <br />Owner . � ” <br />Date � � 9� <br />❑ APPRGVAL � U PARTIAL APPROVAL <br />p VIOLATION r� CORRECTION RF(�UESTED <br />❑ Corrections lisled below MUST BE MADE betore work can be approved. <br />❑ Piease contact inspeclor and arrange for appoinlmenl. <br />❑ Was nol able lo perform inspection. <br />p CALL 259•8810 FOH REINSPECTION — 24 hour nolice required <br />ON THE PREMISOES PRIOR TO OCCUPANCIYSUED AND POSTED <br />NO RE�[yEQliEST FOR INSPECTION WITHIN LAST <br />180 DAYS. FILE HAS BEEN SENT TO RECORDS FOR <br />MICROFILMING. <br />Date _�— <br />Inspeclar TYPE OF INSPECTION REOUESTED <br />❑ Framing O Gas Piping <br />❑ Temp. Elect. � p��all, Nailing O Consullalion <br />p Footing p Shear Nailing O Groundwork <br />p Foundalion p Grid ❑ SlrucL Slab <br />p Ductwork p Rough•in O Final <br />❑ Wood Stove p Service ❑ Insulalion <br />O Masonry p Other <br />p MECH: Pmt. No. <br />5/SSG-- <br />p BLDG: Pmt. Nn. �— <br />p EIEC: Pmt. No. ---- � PLBG: Pmt. No. �----'— <br />n� <br />