Laserfiche WebLink
CLOSFD CM WORK ORDERS REPORT <br />Total Utility ;daintenance Management System <br />07/07/1998 Page 7 <br />Date Range �O1/09/1989 - 06/30/1998 � <br />CM Wark Order Range :7101196751428 - 7101196751445Pattern :* <br />Item Range :<Blank> - WVL3694L05 Patterr. :* <br />Program ALL Function ALL Activity ALL <br />____________________________________________________________________------------- <br />CM WORK ORDER ID: 7101196751431 Title: REDIEW .75 ZNCH 5309 BEVERL,Y LANE <br />« DUPLICATE PRINTING OF THIS WOkK ORDER» <br />Item ID: ti453694A039 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 06/22/1998 <br />0•✓erall Craft: <br />Issued: 04/27/1998 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 houz•s <br />Status: <br />Labor: <br />Craft ID <br />WST AGE <br />WST BBA <br />DLI CJM <br />UL DMJ <br />UL HLF <br />DLI JHR <br />EO KAE <br />UL KNL <br />DLI MTL2 <br />EO PTN <br />HEO WMF <br />HEO WRD2 <br />Materials: <br />ID <br />ADAP3400U347 <br />ADAP34000647 <br />COUP34003947 <br />COUP34004447 <br />PIi�E34060647 <br />Vehicles: <br />ID <br />V2112 <br />V2150 <br />Issued by: GJ Assigned to: AGE <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />ALLEN, GARY E. <br />BRAIJLEY, BROCK A. <br />CHRISTIANSOIQ, JEFFREY M. <br />DOUCETTE, MARK J <br />HUSITY, L�RRY FRANK <br />JAMIESON, HANK R. <br />KARELSEN, ADOLPHUS E. IV <br />KEEFE, NEIL L. <br />MARKHAM, TIMOTHY L. <br />PINON, THOMAS N. <br />WELLMAN, MARK F. <br />WINSTEAD, RICHARD D. <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Descripticn <br />ADAPTER 3/4" CST X INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA-TITGQ <br />COUPLING 3/4" 1/4 BEND COPPERCW <br />COUPLING 3/4" MIP X COP � <br />PIPE 3/4" POLY I.P.S. <br />Description <br />91 CHEV 1 TON <br />87 FORD 2 TON W/CRANE <br />Actual Hrs <br />1.00 <br />1.00 <br />1.50 <br />1.00 <br />1.00 <br />1.00 <br />1.50 <br />1.50 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Cost <br />---- 22.09 <br />20.62 <br />13.50 <br />10.20 <br />15.24 <br />9.00 <br />29.49 <br />24.51 <br />9.50 <br />20.09 <br />20.91 <br />21.34 <br />Total Labor Cost: 222.48 <br />Date <br />06/11/1998 <br />06/11/1998 <br />06/11/1998 <br />06/11/1998 <br />06/11/1398 <br /># Used <br />1 <br />1 <br />.2 <br />Cost <br />8.21 <br />7.07 <br />7.53 <br />3.59 <br />0.36 <br />Total Material Cost: 27.36 <br />Hours <br />1.50 <br />1.00 <br />Cost <br />9.15 <br />5.90 <br />