Laserfiche WebLink
� <br />CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />07/07/1998 Page 1 <br />__________________________________________________________________�_____________ <br />Date Range :O1/09/1989 - 06/30/1998 <br />CM Work Order Range :7101196751428 - 7101196751445Pattern :* <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />-------------------------------------------------------------------------------- <br />CM WGR:< ORDER ID: 7101196751428 Title: RENGW .75 INCH 5315 HEVERLY LANE <br />« DIIPLICATE P12INTING OF THIS WORK ORDER» <br />Item ID: WS3694A043 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 06/22/1998 <br />Overall Craft: <br />Issued: 04/27/1998 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />WST <br />WST <br />DLI <br />UL <br />UL <br />DLI <br />EO <br />UL <br />DLI <br />EO <br />HEO <br />HEO <br />AGE <br />BBA <br />CJM <br />DMJ <br />HLF <br />JHR <br />KAE <br />KNL <br />MTL2 <br />PTN <br />WMF <br />WRD2 <br />Materials: <br />ID <br />ADAP34000347 <br />RDAP34000647 <br />COUY34003947 <br />COUP34004447 <br />PIPE34060647 <br />Vehiclea: <br />ID <br />V2�12 <br />V2150 <br />Is.3ued by: GJ Assigned to: AGE <br />Priority: Tra�rel Time: 0.00 Hr. <br />Name <br />---------------------�--------- <br />ALLEN, GARY E. <br />BRADLEY, AROCK A. <br />CHRISTIANSON, JEFFREY M. <br />DOUCETTE, MARK J <br />HUSBY, LARRY FFANK <br />JAMIESON, HANK R. <br />KARELSEN, ADOLPHUS E. IV <br />KEEFE, NEIL L. <br />MARKHAM, TIMOTHY L. <br />PINON, TIiOMAS N. <br />WELLMAN, MARK F. <br />WINSTEAD, RICHARD D. <br />Description <br />------------------------------ <br />ADAPTER 3/4" CST X INSTA-TITEO <br />ADAPTER 3/4" FIP X INSTA-TITE� <br />COUPLING 3/4" 1/.4 BEND COPPER� <br />COUPLING 3/4" MIP X COP C� <br />PIPE 3/4" POLY I.P.S. <br />Description <br />------------------------------ <br />91 CHEV 1 TON <br />87 FORD 2 TON W/CRANE <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />1.00 <br />1.00 <br />1.50 <br />1.00 <br />1.00 <br />1.00 <br />1.50 <br />1.50 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Total Labor Cost <br />Date # Used <br />-------- -------- <br />06/11/1998 1 <br />06/11/1998 1 <br />06/11/1998 1 <br />06/11/1998 1 <br />06/11/1998 3 <br />Total Material Cost: <br />Hours Cost <br />------ ---------- <br />1.50 9.15 <br />1.00 5.90 <br />Cost <br />22.08 <br />20.62 <br />13.50 <br />16.20 <br />15.24 <br />9.00 <br />29.49 <br />24.51 <br />9.50 <br />20.09 <br />20.91 <br />21.34 <br />222.48 <br />Cost <br />8.21 <br />7.67 <br />7.53 <br />3.59 <br />0.54 <br />27.54 <br />