Laserfiche WebLink
C <br />City of Everett <br />Building Division <br />Area and Fee Calculations <br />For Structures Up to 2500 S.F. <br />Plan Check No. co <br />AREA <br />Main Floor 1) c _SQ. FT. @ $54.80 / S.F. $ 6t001 <br />Upper Floor SQ. FT. @ $54.80 / S.F. _ $ �037 <br />11 <br />Lower Floor 551 SQ. FT. @ S.F. _ $ <br />Garage 54f"� SQ. FT. @ $21.60 / S.F. _ $ Ii 750 <br />Deck IZI) SO. FT. @ $14.90 / S.F. _ $ <br />Other SQ. FT. @ $ / S.F. _ $ <br />TOTAL $ /0 Z, 99 / <br />Total conditioned Space <br />Glazing <br />Main Floor __SQ.FT. <br />Upper Floor SQ.FT. <br />Lower Floor SQ.FT. <br />Total SQ.FT. % <br />