Laserfiche WebLink
everett INSPECTION REPORT/ - <br />eAddress Sa'SU�i2C C G—OARI <br />ContractorAcrr`fC= f7 "� <br />N V <br />Owner — <br />Date <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Pmt. No. `❑ MECH: Pmt. No. <br />❑ ELEC: Pmt. No. A' PLBG: Pmt. No. ? S� <br />❑ Temp. Eiect. ❑ Framing((( "` ❑ Gas Piping <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation D Shear Nailing ❑ Groundwork <br />❑ Ductwork D Grid ❑ Struct. Slab <br />❑ Wood Stove �Rough•In ❑ Final <br />son tt77 SService ❑ <br />%APPROVAL 0 PARTIAL APPROVAL <br />VIOL El CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform Inspection. <br />❑ CALL 259.8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector �_ r _ �^ Date u� <br />