Laserfiche WebLink
CM WORK <br />DERS <br />Total utilityEMaintenanceRManagementTSystem <br />07/17/1997 <br />------- ----------------_----- <br />Date Range :12/03/1900 - 07/01/1997 <br />CM Work Order Range :1001091070001 - PW2548-19- <br />Item Range :<Blank> - WVL3694L05 <br />Program ALL Function ALL ---- Activity ALL <br />�" "vxn vxuZH ID: 7101196730239 (continued) <br />N/A COLD MIX <br />N/A C.D.F. (WILDER) <br />PIPE42055247 PIPE 4" TYTON JOINT DIASSOC) <br />PLUG38108447 PLUG 2" BRASS NPT <br />SLEE44087847 SLEEVE TAP 6" W/4" TAP STLS <br />VALV42036448 VALVE GATE 4" MJ X FLANGE CI <br />vebicles: <br />ID Description <br />V0017 <br />94 <br />FORD <br />-------------- <br />AEROST'AR VAN <br />V2112 <br />91 <br />CHEV <br />1 TON <br />V2139 <br />V2156 <br />86 <br />CHEV <br />1-TON W/HYD. UNIT <br />89 <br />DODGE 1 TON <br />V2225 <br />88 <br />FORD <br />8YD <br />V3200 <br />V3505 <br />80 <br />CASE <br />VIBROMAX W25 ROLLER <br />82 <br />CASE <br />BACKHOE <br />V3508 <br />88 <br />CASE <br />BA�KHOE 4X4 <br />V6401 <br />VJ0002 <br />80 <br />CASE <br />FLATBED TRAILER <br />93 <br />INTERNATIONAL 10 YD <br />VJ0010 <br />VJ0017 <br />95 <br />'96 <br />INTERNATIONAL <br />BOOM TRUCK <br />FORD <br />5 YARD <br />VJ0020 <br />'96 <br />FORD <br />DUMP 10 YARD <br />VJ0021 <br />'96 <br />FORD <br />DUMP 10 YARD <br />Pattern :7101196730239 <br />Pattern :* <br />Pane <br />06/30/1997 1 49.82 <br />06/30/1997 1 135.38 <br />06/30/1997 46 7.62 <br />06/25/1997 1 3.13 <br />06/25/1997 1 212.41 <br />06/25/1997 1 164.04 <br />Total Material Cost: 1493.26 <br />s',;�I 9 <br />Hours ---Cost E14 7 <br />------ 9.00 <br />2.50 <br />6.00 <br />22.00 <br />2.50 <br />2.50 <br />16.00 <br />22.00 <br />2.50 <br />2.00 <br />12.00 <br />2.50 <br />4.00 <br />8.00 <br />Total Vehicle Cost: <br />52.20 <br />13.28 <br />28.80 <br />112.20 <br />38.40 <br />49.30 <br />259.20 <br />365.20 <br />0.00 <br />42.80 <br />532.80 <br />36.8E <br />90.40 <br />180.80 <br />1802.25 <br />Work Description: <br />----------------- ----------------- ----------------------- <br />TAP AND INSTALL 4" ---------------- <br />MAIN ACROSS ROAD. ---- <br />Total cost for work order 7101196730239: <br />6014.36 <br />