My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7621 BEVERLY LN 2018-01-02 MF Import
>
Address Records
>
BEVERLY LN
>
7621
>
7621 BEVERLY LN 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 11:01:34 AM
Creation date
1/23/2017 2:27:56 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY LN
Street Number
7621
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
815
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST S T . SHEET <br />Receipt # 12Z9ZZn <br />X Cost of Work Order <br />Cost of Service Order <br />Contact Person Jeff Moore <br />Requested By Kirk Brooks <br />Property Owner (name) Everett School Dist #2 <br />Charge Cot to (name if different than owner) <br />Address 4730 Colbv Ave <br />Installation Location 76th & Beverly Ln <br />Public Work, Department <br />Utilities Division <br />3200 Cedar Street <br />Everett, Washington 98201 <br />(206)259-8800 <br />................... <br />CITY OF EVERETI <br />Buildin0 Division Date Paid <br />��- <br />9,299.00 Work Order # <br />City Everett <br />Service Order # <br />Telephone # 339-4226 <br />Date of Request 5-5.97 <br />Zip 98203 <br />Installation type/description/size/etc. Main extension. Expose 6" in Bev. Ln, cut street to east, make 4" tap; install <br />50" (±) 4" DI pipe, backfill and restore area. <br />® The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />The following estimate is based upon the Street Division work group providing all labor, equipment, <br />materials and restoration to property. <br />Please notify the City of Everett Utilities Division 10 working days in advance of renuired installation date to <br />allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the installation. <br />Itemized Cost Estimate: <br />Labor & Benefits <br />Material <br />Equipment Rental <br />Surface Restoration <br />Sales Tax <br />TOTAL <br />5,184.00 <br />1,908.00 <br />1,526.00 <br />2" meter ($1,200.00) required on separate serv. order <br />Prepared by: <br />Accepted by: <br />COSTAGNU=1 3n,104515N1) <br />cc: Bldg. Permit Center <br />Clair Olivers <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Paul McKee <br />Gerry Cmm <br />Date Est. / <br />PLe <br />pared: Representing. �4-���c l\,, <br />5^5-97�....... <br />
The URL can be used to link to this page
Your browser does not support the video tag.