Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT 76.2 / 0�� <br />Total Utility Maintenance Management System <br />10/28/1998Page 1 <br />Date Range :06/24/1900 - 10/21/1998 <br />CM Work Order Range :0810800810001 - UT2883- Pattern :7101196730308 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />-------------------- <br />CM WORK ORD'c.R ID: 7101196730308 Title: TAP 79TH/BEVERLY LANE <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: WML178bV01 -- WATER MAIN LINE <br />Location ID: -- <br />Program 710 Function 119 Activity 673 <br />Date Completed: 10/14/1998 <br />Overall Craft: <br />Issued: 07/14/1998 Issued by: GJ Assigned to: AGE <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft <br />ID <br />Name <br />Planned Hrs <br />Actual Hrs <br />Cost <br />----- <br />WST <br />------ <br />AGE <br />------------------------------ <br />ALLEN, GARY E. <br />----------- <br />0.00 <br />---------- <br />9.00 <br />---------- <br />198.72 <br />WST <br />BHA <br />BRADLEY, BROCK A. <br />0.00 <br />9.00 <br />186.03 <br />UL <br />CJE <br />CASE, JAMES E. <br />0.00 <br />6.00 <br />97.20 <br />UL <br />DMJ <br />DOUCETTE, MARK J <br />0.00 <br />9.00 <br />145.80 <br />SUP2 <br />GJ <br />GARZA, JOHN (NMI) <br />0.00 <br />5.00 <br />132.60 <br />EO <br />PTN <br />PINON, THOMAS N. <br />0.00 <br />3.00 <br />60.27 <br />HEO <br />WMF <br />WELLMAN, MARK F. <br />0.00 <br />9.00 <br />188.19 <br />Materials: <br />'D Description <br />!30X000043347 BOX VALVE 18"TOP 24"BOTTOM CI <br />GASK46032347 GASKET 8" FIELD LOCK <br />MEGA46044347 MEGALUG 8" SERIES #1108 <br />N/A 8" MJ KIT <br />N/A 8" FLANGE KIT <br />N/A TAP FEE <br />N/A 8" MJ KIT <br />N/A BLEACH <br />SLEE46034047 SLEEVE TAP 811MJ X 8"FLANGE CI <br />VALV46043048 VALVE GATE 8" MJ X FLANGE <br />Vehicles: <br />ID Description <br />------------ ------------------------------ <br />V0017 94 FORD AEROSTAR VAN <br />V2137 84 GMC BOOM TRUCK 5 TON <br />Total Labor Cost: 1008.81 <br />Date # Used <br />Cost <br />-------- -------- <br />09/17/1998 <br />---------- <br />3. 30.09 <br />09/17/1998 <br />1 57.41 <br />09/17/19ZL <br />1 25.39 <br />G9/17/1998 <br />1 25.00 <br />09/17/1998 <br />1 6.53 <br />09/17/1998 <br />1 150.00 <br />10/14/1998 <br />4 100.00 <br />10/14/1998 <br />4 5.28 <br />09/17/1998 <br />1 459.85 <br />09/17/1998 <br />1 341.05 <br />Total Material Cost: 1200.60 <br />Hours Cost <br />---------------- <br />5.00 23.50 <br />6.00 132.00 <br />1% IV <br />