Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved pinn dated <br />5. Connect side sewer per City Standard N601. <br />�§. Connect side sewer per Cibj Standard q's 601, 602, 604. <br />7. <br />� <br />Connect all rooftop downspouts to tho side sewer. <br />Connect rooftop downspouts to the drainage system provided f�r this lot. <br />9. Rooftop runoff must be discharged ;o a roof downspout infiltration system per City of Everett <br />5tortn Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. A catch basin as per City S:andard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the perking area. <br />1 t. Remove and replace curb, gutter and sidewalk as per Ciry of Everett Standard Plan li's 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete c!��veway per City of Everett Standard #307. <br />13. Pave driveway from the front pr��pert� line out to the street paving. <br />14. Contact the . _ Water District for connecting provisions for this build(ng's <br />water ancJ sewer services. <br />15. If a sewer pump system is to be installed, the pressure line must dfscharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />16. The contractor must mee! with the Public Works Inspector to discuss potentiel drainage <br />routing prior to beginni: ig the praject. <br />17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />I� �aLL G—�C�kV�.-(�.1� !�-IPcTL-.-Q i,�L I—�nry9 /=OUdJD4T7oA <br />5 r OE'ct�/-JL�, D�1 �'e��a� 1i-rs�'L.� �3E H+��1Ltc,�� To A-�tJ <br />f�'���jiL�c"7i �Ei2�%'7il%��J �/i� ^i0 „c.'�'SiC��UC� C� �%%9TL:Y/iiL <br />o n -I-�i,� �v��.[,LNCj .C.D % . <br />�� i2 G3,�„-�`c�l � <br />rwt«mw�u (t/{�� <br />