My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7818 BEVERLY LN 2016-01-01 MF Import
>
Address Records
>
BEVERLY LN
>
7818
>
7818 BEVERLY LN 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 10:52:50 PM
Creation date
1/23/2017 2:33:28 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY LN
Street Number
7818
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />c.�= <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Worics approved plan dated <br />5. Connect side sewer per City Standard N801. <br />,{ et:/ Connect side sewer per C(ty Standard #'s 601, 602, 604. <br />'l/ <br />7, Connect all rooftop downspouts to the side sewer. <br />�onnsct rooftop downspouts to the drainage system provided for this lot. <br />Rooftop runoft must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.8.2. Width _, Depth _, Length _. <br />10. A catch basin as per Cfty Standard Plan #402 with a gas trap per Standard Plan M410 is <br />required for the parking area. <br />11. Remove and repiace curb, gutter and sidewalk as per Ciry of Everett Stan�ard Plan N's 305A <br />8 306 on thie proposal's frontage as directed by the Public Wo�lcs Inspector (i.e. ali unused <br />driveways and any broken or damaged area must be replaced). <br />12. Instail a Type I concrete driveway per City of Everett Standard M307. <br />13. Pave driveway from the front property line out to the street paving. <br />14. Contact the � Water District for connecting provisions for this building's <br />water and sewer services. <br />15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then graviry flow across the pubUc right-of-way. <br />16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing priar to beginning the project. <br />17. A sprinkler system is required for this building in compliance with the reqwrements of NFDA <br />Standards 13D. . <br />I� laLL G-�Csti�/o.TCD h-lt��t•-P ia'L F�O�ti9 r"Ov•U0dT7aA <br />s,oe��,ae.�, ve,✓ec„� s�u �ac H+�t�L�--'� To �-,u <br />,4-/�i'�2wc-v PE,2/J�;r��� ,:� No �u�f-s;E��uc, oFrn����s1L <br />� <br />o n +�u 8u�; cLNC� ,c,o i. <br />rwc«�.�n <br />2�L <br />
The URL can be used to link to this page
Your browser does not support the video tag.