My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7822 BEVERLY LN A 2016-01-01 MF Import
>
Address Records
>
BEVERLY LN
>
7822
>
7822 BEVERLY LN A 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 1:53:21 PM
Creation date
1/23/2017 2:34:03 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY LN
Street Number
7822
Unit
A
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public',Vurks approved plan dated <br />5. Connect side sewer per City Standard #601. <br />6. Connect side se�ver per City Standar,l #'s 601, 602, 604. <br />7. Connect all rooftop downspouts lo the side sewer. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. The approximate si�e trench is 3.5' wide, 2' deep and 25' long. See <br />attachment for more details. <br />The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning lhe project. <br />Install erosion control measures as determined by the Public Works inspector, such as silt <br />(ence, straw bales, swales, or erosion blankets. <br />Install erosion control measures per City of Everett Standards for smail parcels <br />Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />All excavated material from foundation, sidewalk and driveways shail be hauled to an <br />approved, permitled site. No wasting of malerial is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />ariveways and any broken or damaged area must be reptaced). <br />� <br />17 <br />Install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway from the front property line out to the street paving. <br />18. Contact the Water District (or connecting provisions for this building's <br />water and sewer services. <br />19. <br />20. <br />21 <br />A catch basin as per City Standard Plan #402 wilh a gas trap per Star�dard Plan #410 is <br />required for the parking area. <br />If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, ti�?n gravity flow across the public right-of-way. <br />A sprinkler system i� �equired for this bwlding in compliance with the requirements of NFDA <br />Standards 13D. <br />PC;Commenl5 <br />�Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.