Laserfiche WebLink
PUBLIC WORKS PEFiMIT COMMENTS <br />4. As per Public Wcrks approved plan dated <br />5. Connect side sewer per City Standard #601. <br />6. Connect side sewer per City Standard �'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />8. Connect rooftop �ownspouts to the drainage system provided for this lot. <br />9. Rcoftop runoff must be discharged to a roo( downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. A catch basin as per Ciry Standard Plan n402 with a gas trap per Standard Plan �410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan �'s 305A <br />& 306 on this proposal's irontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete driveway per City of Everett Standard #307 <br />13. Pave driveway from the front property line out to the street paving. !'r; u�:''� i• �� '�� < r��^� 't �• <br />,��.•i. r� ��•v,����, <br />14. Contact the __ NJater District for connecting provisic �is for this building's <br />water and sewer services. <br />15. If a sewer pump system is to he installed, the pressure line must discha�ge into a private <br />manhole, then graviry flow across the public ria!'a-of-way. <br />16. The contractor must meet with the Public VVerks Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkle� system is required fcr ;his building in compliance with the requirements of NFDA <br />Standards 13D. <br />18. Ail excavated materlal irom toundation, sidewaik and driveways shall be hauled to an <br />approved, permitted site. No �.vasting of material is allowed on this building lot. <br />,,��� ,�� , <br />�l2 <br />