Laserfiche WebLink
Total <br />QL08ED CM NORR ORDERB REPORT TQ <br />Utility Maintenance Management System <br />_____ 11/14/1995 <br />Ila*e n..�__ --eeeeo=eeeeeee-�_ <br />POSTING AF'�yb <br />— -.....y� .�..�uy�1989 ---_________________ <br />CM Work Order Range :10010910700015- UT2608- c <br />Item Range :<Blank> - WWZZpZ0001 - pattern :7101196648517 <br />Proqram ALL Functlon ALL Activity ALL Pattern ;* <br />�___________�----------------- <br />rM �.,,,.,., --- ----------------------- <br />"••"�R lu: i1o1196648517 Title: SO .75.INCH 132 E BEECH ST <br />Item ID: <br />Location ID: <br />Program 710 Function 119 <br />Date Completed: 1?/O1/1995 Activity 664 <br />Overall Craft: <br />Issued: 08/29�1gg5 <br />out of Service? NO Issued by: W�7 Assigned to: <br />Meter Reading: Priority: Travel Time: 0.00 t�r, <br />Downtime: o hours <br />Status; <br />Lebor: <br />Craft Ip <br />UL SSJ <br />DL WCA <br />WST WDT <br />Materials: <br />ID <br />AUAP34000547 <br />BOX000056247 <br />CORP34001847 <br />COUP34004847 <br />ELIA34104247 <br />METE36089447 <br />PZPE34060647 <br />SADD44016847 <br />SETT34033647 <br />WIRE00119847 <br />Vehicleas <br />ID <br />V2117 <br />VT0007 <br />Name <br />-------------- <br />--------------- <br />SMITH, STEVE J. <br />WHETSTZNE, CHRIgTOPHER A. <br />WALDEN, DAROLD T. <br />Description <br />ADAPTER 3/4'� MIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />CORP STOP 3/4" CCT X INSTA @ <br />COUPLZNG 3/q�� g1+RpIGNT MET. @ <br />ELL 3/4° STREET BRASS ^ <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />PIPE 3/4" POLY I.P.S. <br />SERVICE SADDLE 6° W/3/4" CCT <br />SETTER COP 5/8" X 3/4" (H12") <br />TRACING WIRE 10 GAUGE <br />Planned_}Irs <br />0.00 <br />0.00 <br />0.00 <br />Actual_Hrs <br />6.00 <br />6.00 <br />6.00 <br />Total Lahor Cost: <br />__Date__ <br />11/O1/1995 <br />11/O1/1995 <br />11/O1/1995 <br />11/O1/1995 <br />11/O1/1995 <br />11/O1/1995 <br />11/O1/1�95 <br />11/O1/1995 <br />11/O1/1995 <br />11/O1/1995 <br />_#_Used_ <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />32 <br />Total Material Cost: <br />Description <br />------------- --- Hours <br />91 CHEV 1-TON HYD UNIT Y <br />94 AT]:J�S COMPCO COMP. 6• 00 <br />6.00 <br />Total Vehicle Cost• <br />___Cost__- <br />33.60 <br />43.20 <br />n <br />---Cost--- <br />90.18 <br />48.00 <br />120.46 <br />258,66 <br />_`_Cost___ <br />7.72 <br />13.01 <br />14.87 <br />2.70 <br />1.75 <br />30.85 <br />0.26 <br />11.46 <br />52.28 <br />3.20 <br />138.10 <br />work Description: ' �6•80 <br />------------------------- <br />