Laserfiche WebLink
April 13, 2004 <br />Mr. (tick Penn:son <br />410 E. Beech Street <br />Evcre.tt, WA 98203 <br />Subject: Project. <br />Job Addrevs: <br />Plan Check No: <br />Dcar Mr. Pearson: <br />Pearson <br />410 F. Beech Street <br />C0404-001 <br />In response to your application for u construction permit, your plans have been examined and <br />you are. advised that the issuance of n permit is being withheld for the reasons listed below. <br />'t hcse comments address building issues only. Additional revisions or additions may he required <br />by other dcpartmonts (sthrh as Utilities, Planning or Fire). All references refer to the 1997 <br />Uniform Building Code, us amended by the State of Washington and/or Washington State <br />Energy Code 2001 Edition, unless stated otherwise. <br />in order for the processing ll your application to continue, it will be necessary <br />to Ilrovide the Building Division with two complete new sets of drawings <br />redlecling the corrections requeslyd. <br />mil. 4 x 12 beam in crawl space appears to be over -spanned. Provide new beam size, <br />species and grade or reconligurc suppon(s). <br />9--2. Provide fluor plan of bathroom layout. Show location of all fixtures. <br />3. Provide nunimmm 50 cfm exhaust fan in new bathroom. <br />4. Provide smoke detector in Of sleeping rooms and in the corridor or aren giving access <br />to each separate sleeping area. Detectors in new bedroom to be 100 volt with battery <br />back up. Detectors in existing bedrooms may be solAly battery operated. <br />v 5. Priwidc safety glass in haiardous locations as dcPr A in Chapter 2406 UBC. <br />,mob. Show location of girder truss for hipped roof'. Show post and or multiple studs <br />supporting roof loads. <br />qt raA. <br />7. Provide insulation heffid Baffle shall extend 6' vertically above, baits and 12" vertical <br />above loose -fill insulation <br />i x nmu�:wstnnu nHewloro�mr OWL nrwr M /1/ <br />