Laserfiche WebLink
INSPECTION REPORT <br />f� Address 6�3i <br />Contractor a <br />Owner . 0 5 2 <br />Date oA - 13- f 7 <br />)CAPPROVAL J PARTIAL APPROVAL <br />J VIOLATION J CORRECTION REQUESTED <br />J Corrections listed below MUST BE MADE before work can be approved. <br />J Please contact inspector and arrange for appointment. <br />J Was not able to perform inspection. <br />J CALL 259-NIO FOR REINSPECTION - 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector <br />HYPE OF INSPECTION REOUESTED <br />J Temp. Elect/ J Framing <br />JJrooting Drvwalf Nailing <br />J Gas Pi ing <br />J Consultation <br />U Foundation <br />,J <br />>Zheaf Nailing <br />J Groundwork <br />J Ductwork <br />J Wood Stove <br />J Masonry <br />J Grid <br />J Rough -in <br />J Struct. Slab <br />J Final <br />J Insulation <br />er <br />her <br />e <br />�BLDG: Pint. No. <br />J MEC& Pit. No. <br />O ELEC: Pmt. No. <br />G PLBG: Pmt. No. <br />