Laserfiche WebLink
c�nriic <br />Plans Exeminer— IIII oul lhis glazing sedlon or anach o window schedule lo lhis checklist. Inspedor — verlly window In• <br />lormallon durinp Iiald Inspectlons. Indude skyliphls, glasy doors arM eJl o(hor plazing on this lortn. Use rough openlnp <br />erBe I0f ceIW18tI0ns. � <br />Size Ouantlty Area U•Value/Manufecturer Verified <br />LJ G(. Z/d/G u QE <br />U- �t LE <br />Tolel gleilnp erea: 7% � <br />Tolei condit�oned aree: � 2.g � <br />Perantape glaxing: ( �i'� 3 ��s VeAlled <br />DOORS <br />Plans Exeminer— IiM opeque doore by type (solid croie, insulated, eta), quentity, U�value, end manuladurer. <br />inspador— verlly door Inlortn:�tlon durinp Iie�d InspecUon. <br />Sipnatute ol Bulldinp Ofllclel: <br />Deta of Flna� Inepecllon: I�9t � <br />