Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />As per Public Works approved plar� dated <br />Connect side sewer per City Standard #601. <br />Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect all rooftop downspouts to the side sewer. <br />Connect rooftop downspouts to the drainage system provided for this tot. <br />9. Rooftop runoff must be discharged te a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. The approximate �ize trench is 3.5' wide, 2' deep and 25' long. See <br />attachment for more details. <br />10. <br />11 <br />The contractor must meet with the Public Works Inspector tu discuss potential drainage <br />routing prior to beginning the project. <br />Install erosion control measures as determined by the Public Works inspector, such as silt <br />�ence, straw bales, swales, or erosion blankets. <br />�� 1�. Install erosion control measures per City of Everett Standards for small parcels <br />! 13. , Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />1a � All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />� approved, permitted site. No wasting of materia' is allowed ::n this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />� <br />17 <br />In�tall a Type I concrete driveway per Cily of Everelt Slandard #307. <br />Pave driveway from the front property line out to the street paving. <br />18. Contact the _ Water District for connecting provisions for this building's <br />water and sewer services. <br />19 <br />20. <br />21 <br />A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required `or the parking area. <br />I! a sewe� pump system is to be installed, the pressure line must discharge into a private <br />rnanhole. then gravity flow across the public right-of-way. <br />A sprinkler system is required for this building in compliance with th= requirements of NFDA <br />Standards 13D. <br />PI�iC.:f11�T.afl�$ <br />