Laserfiche WebLink
Dated- 3WI <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Describe Proposed Work <br />Public Work*Permit a <br />ti <br />Bldg peel • - <br />Public Works Fee $ <br />Total Fee <br />Less Apo[ Fee Paid 5 <br />Balance Due <br />Phone <br />Project Address (if known) ac ii 60 nd _57 <br />Attach tour (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Pronerty Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />WRITE BELOW THIS LINE <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance- phone 259.8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Constl uction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1.800.424.5555. <br />8y <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />i <br />relt PUBLIC WORKS DEPARTMENT <br />Ever Cedar Street <br />Everett WA 98201 <br />Phone: 259.8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />Z <br />O <br />H <br />N <br />O <br />a <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages. costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />