Laserfiche WebLink
CIASED CM WORK ORDERS REPORT l <br /> Total Utility Maintenance Management System <br /> 06/21/1994 Page 1 <br /> ________________________________________________________________________________ <br /> Date Range :06/O1/1992 - 06/21/1994 <br /> CM Work Order Range :<Hlank> - 84054210&0229 Pattern :7401196750892 <br /> Item Range :<Blank> - WW22020001 Pattern : * <br /> Program ALL Function ALL Activity ALI� <br /> ----•____________________________________________________________ <br /> CM WORK ORDER ID: 7401196750892 Title: CONVERT 109 BRIDGEWAY <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS0895Q008 -- WATER SERVICE <br /> Location ID: -_ <br /> Program 740 Function 119 Activity 675 <br /> Date Completed: 06/06/1994 <br /> Overa?.1 Craft: <br /> Issued: 06/06/1994 Issued �y: SKL Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs <br /> ----- ------ Cost <br /> ------------------- <br /> ----------- ----------- ---------- <br /> WST MKC MOORE, KIM C. 0. 00 3 .00 59 19 <br /> UL SR7 STENSETH, ROIIERT J. 0. 00 3 . 00 <br /> 44 . 10 <br /> Total Labor Cost: 103 29 <br /> Materials: , <br /> ID Description Date <br /> ---_________ tt Used Cost <br /> ------------------- <br /> ----------- ------•-- <br /> BOX000056247 BOX METER PLA 15" X 1C"' W/LID 06/07/199q 1 <br /> COUP34004147 COUPLING 3/4" COP X COP ELBOW@ 06/07/1944 1 12 . 31 <br /> COUP34004347 COUPLING 3/4" MIP X COP ELL @ 06/07/1�94 1 5. 86 <br /> COUP34004647 COUPLING 3/4" ANG MET X FIP @ 06/07/1994 1 3 . 50 <br /> METE36089447 METfiR 5 8" * 4 • i� <br /> ?IPE34042847 PIPE 3/4" COPPERRTUBINGRTYPERK 06/07/1994 3 z� • Z1 <br /> VALV34008648 VALVE METR 3/4" L/W FLARD COP@ 06 07 1994 1 3 . 75 <br /> � � 9 . 33 <br /> Total Material Cost: 66 23 <br /> Vehicles: <br /> ID Desc.ription Date Hours <br /> ------------ -�-------------- Cost <br /> -------------- --/--/-- <br />, V2117 CHEV 1 TON '91 06 07 1994 3 . 00 17 . 40 <br /> Total Vehicle Cost: 17 40 <br /> Work Description: <br /> ------------------------------- <br /> --------------------------------------------- <br /> MET.ER# 114?6 METER IS LOCKED OUT. <br /> Total cost for work order 7401196750892 : <br /> i86. 92 <br />