Laserfiche WebLink
--� <br /> ' CLOSED CM WORR ORDERS REPORT <br /> Total Utility Maintenance Management System <br /> 05/O1/1997 Page 1 <br /> ________________________________________________________________________________ <br /> Date Range :O1/09/1989 - 04/24/1997 <br /> CM Work Order Range : 1001091070001 - 8401086700001Pattern :7101236730205 <br /> Item Range :<Blank> - WVL3694L05 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> CM WORK ORDER ID: 7101236730205 Title INSTALL 216 - BRIDGEWAY <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: __ <br /> Location ZD: -- <br /> Program 710 Function 123 Activity 673 <br /> Date Completed: 04/O5/1997 <br /> Gverall Craft: <br /> Issued: 04/04/1997 Issued by: HDA Assigned to: AGA <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: HN <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> -- ------ ------------------------------ - <br /> ---------- ---------- ---------- <br /> HEO AAL ARNOLD, ARTHUR L 0.00 11. 00 222.53 <br /> SUP1 AGA AHLES, GREGORY A. 0,00 1.00 22. 36 <br /> UL MHA MAROON, HERBERT ARTHUR 0. 00 11. 00 155.43 <br /> EO MJL2 MITCHELL, JEFFREY L. 0.00 4 .00 7g,3Z <br /> EO SDK STUART, DARRELL K. 0.00 7. 00 134.05 <br /> Total Labor Cost: 612 69 <br /> Materials: <br /> ID Description Date # Used Cost <br /> ---------- ---------------------------- <br /> - --/--/-- -------6 -----• ---- <br /> BRIC00061156 HRICK CONCRETE 2" X 4" X 8" 04 05 1997 1.74 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 04/05/1997 2 23.70 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. HAG 04/07/1997 1 11 85 <br /> N/A F'RAME & GRATE (SALVAGE) 04/O5/1997 1 0.00 <br /> N/A TOP COARSE 04/05/1997 10 138.80 <br /> N/A CB17 (ASSOC) 0�08/1997 1 141,�_ <br /> PIPE46304347 PIPE 8" PVC SEWER 04/O5/1997 100 215.00 <br /> PIPE46304347 PIPE 8" PVC SEWER 04/07/1997 2 4.30 <br /> Total Material Cost: 536 94 <br /> . Qeh���e9: - a.go .as <br /> ID ______ Description Hours Cost $'� cp <br /> ------ ------------------------------ � / <br /> V0010 '92 GMC S10 PU <br /> 1 00 5 40 <br /> V2230 91 FORD F800 DUMP 5 YARD 4. 00 43.20 <br /> V3507 88 CASE BACHIiOE 4X4 11.00 405. 90 <br /> VJ0002 93 INTERNATIONAL 10 YD 7. 00 149.80 <br /> VJ0004 '95 CHEV 1-TON 11. 00 64.90 <br /> Total Vehicle Cost: 669.20 <br />