Laserfiche WebLink
02, <br /> � <br /> Page 1 <br /> Work Activity Work Order �o�3�,zooZ 9;z3 <br /> Work Order Intormation <br /> Work Order No 2qQ1g43 Project No Status CL Rel Work Order <br /> Activity Type SR Work Status <br /> Issued By WARD,MICHAEL W. <br /> Date Issued �p/�q���p <br /> Fund 401 Account Type 5 Program 710 Function 119 Activiry 673 <br /> Job Cost No _ <br /> Title REPAIR 216 BRIDGE WAY 710119673 <br /> Problem Iniortnation <br /> Address 216 Street BRIDGE WAY <br /> Cross Street <br /> City <br /> Problem Code Wq7ER Sub Problem LEAK <br /> Requested By <br /> Date Requested Agency Initiated From PUBLIC � <br /> Structure/Equipment Intormation <br /> StrucVEquip Number WML0895�04 Struct/Equip Type yypMAIN WATER MAIN <br /> Feet Descrfption <br /> Assignment Information <br /> Assigned To WELLMAN,MARK F. <br /> Comments MAIN CRACKED WHEN CONTRACTOR HIT UNMARKED SERVICE. <br /> Close-out In(ormation <br /> Action Taken INSTALLED WRAp-A-ROUND W/3/4• TAP AFTER DRILLINC HOLE TO STOP CRACK AT CORP. <br /> Cornpleted By... GALLAGHER,THOMAS J. Date Completed: �p/14I2002 <br /> Problem Description: <br /> STATED THEY HIT 3/4 UNMARK COPPER LINE.WATER RUNNING INTO DITCH. <br />