My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1028 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
1028
>
1028 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 6:32:51 PM
Creation date
1/23/2017 6:32:04 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1028
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18. 8uildings or portions of buildings or facilities exceeding 30 feet in height above the lowest <br /> level of fire departmenl vehicle access shall be provided wilh approved fire apparatus <br /> access roads capable of accommodating fire department aerial apparatus. Overhead <br /> utiiitv and power lines shall not be located within the aerial Tire aaparatus access <br /> roadwav. <br /> GENERAL INFORMATION <br /> 1. Puget Sound Energy is lhe nalural gas provider in this area. To initiate new service orders, <br /> please contact Marilyn Davis Westlund at(425)356-7512 at least 90 days prior to the <br /> required in-service date. <br /> Any relocation of existing gas facilities for this development will be at the d�veloper's sole <br /> expense, and requires 90 days minimum notice. Please contact Elaine Babby at(206)224- <br /> 2018 to coordinate relocation requests. <br /> 2. The Snohomish Counly PUD currently has sufficient capacity to serve the proposed <br /> development. For further information about specific electrical service requirements, please <br /> call Kurt Marlin of ihe Dislricl's Customer Engineering of(ice at(425)258-8291. <br /> 3. Verizon Northwest has facilities near lhis localion. However, any building entrances must <br /> be coordinated at least 60 days in advance. The cost of any relocalion of Verizon facilities <br /> that is required io construcl lhe new apa�tments will be at the total expense of the <br /> developer. Any relocation will lake 60 to 120 days. Please contact Mike Hupf, Engineer at <br /> (425)356-4053 or Mike Bly, Engineer at(425)356-4034 if you have any questions <br /> regarding this building enlrance. <br /> 4. Verizon Northwest will provide service to the site. However, new telephone cable �I <br /> construction will be required in conjunction with the site development. Verizon's � <br /> engineering will begin when lhey are notiFied of your conslruction schedules and telephone I <br /> requirements. <br /> It will be the developer's responsibilily to provide a suitable combination of conduit and <br /> trenching and/or riser conduit to accommodale Verizon's network communications cable <br /> within lhe complex. Provided that an acceptable combination of conduit and/or trenching is <br /> incorporated into the projecl to accommodate Verizon's entrance cable, there will be no <br /> costs to lhe developer for Verizon's cable. <br /> If a rearrangement of existing cables on premises or on the right-of-way is necessary, <br /> appropriate charges will be eslimated and Verizon's Guaraniy of Payment form will be <br /> (onvarded to you (or your signalure. Prior to commencement of Verizon's engineering for <br /> such rearrangement, a deposit will be required. To insure timely telephone service, <br /> Verizon requesis ninety(90) days lead time (or engineering, procurement, and installalion <br /> o(cable and/or Verizon's equipment. <br /> Please contact Michael HupF, engineer, at(425)35E-4052 or Mike Bly, Engineer at <br /> (425)356-4034 should you require additional information. <br /> S:�FSidtliq\WINWORDISEPA\09-001 ECC heallh-filness Pinal.doc <br /> ��ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.