Laserfiche WebLink
i <br /> I 6. Removal and Disoosal of Contaminated Maferials: Remove ali conlaminated soil and place <br /> on a plastic liner, cover with plastic, and remove offsite within 24 hours. Properly dispose <br /> o(contaminated soil aC an approved disposal facilily. Collect absorbent and other materials <br /> Iinto a labeled confainer and oroperly dispose of at an approved disposal facility. <br /> ?. Follow-Up Reportinq: Fill ou[ a Spill Report Foim �vithin 2 �a�orking days and submil it to <br /> IContractor's ESC Lead. <br /> SPCC Program Management <br /> I All Contraclor employees�vill be treined in these spill control and response procedures, including <br /> spill source and recep[or recognition, spill prevention techniques, spill response measures, and <br /> spill reporting prococol. <br /> IShould sile conditions change, this SPCC will be updated as necessary. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> ( <br /> I <br /> I <br /> I <br /> I _ <br /> I <br /> I Srormk�ater Sile Plan O Q = O <br /> Everett fommunity College <br /> Topper Parking Lot Zl <br /> 208221.10 <br /> i 2K <br /> I <br />