Laserfiche WebLink
� <br /> i7.0 SPECIAL REPORTS AND STUDIES <br /> � A Geotechnical Report prepared by GeoEngineers, is included in Appendix B. <br /> S.O OTHER PERMITS <br /> � No other special permits are anticipated at this time. <br /> 9.0 MISCELLANEOUS FORMS AND WORKSliEETS <br /> � It has been determined that there are no seasonal limitations for this project, as per the Seasonal <br /> Limitations Rating Checklist(see Appendix A, Exhibit 5). A Bond Quantities Worksheet will not be <br /> � required (or this project. <br /> 10.0 MAINTENANCE AND OPERATIONS REQUIREMENTS <br /> 1 This sedion includes a list of specific permanent and construdion BMPs, and instructions for their <br /> maintenance. Maintenance guidelines for erosion control facilities should be onsite aC all times <br /> � during construction, and the checklists for permanent stormwater facilities shall be kept by those <br /> responsible for the maintenance of these facilities. A checklist shall be prepared and submitted <br /> to lhe City of Everett per the(ollowing schedule: <br /> � • Monthly from November through April <br /> • Once in late summer(Sepfember) <br /> I • After any major storm event(items marked "s"oniy) <br /> The items for maintenance consideration are as follows: <br /> ITemporary Construction Erosion/Sedimentation Control BMPs <br /> I1. Filter Fabric Fence <br /> 2. Temporary Construction Entrance <br /> � 3. Construction Fencing <br /> 4. Catch Basfn Inlet Protection <br /> l _ 5. Cover Measures <br /> 6. Dust Control <br /> I Permanent Sformwater Facilities. Grounds Maintenance and Pest Conlrol <br /> t 1. Storm Drainaae Pipes <br /> 1 <br /> Z. Catch Basins <br /> � 3. Parking Lot Cleaning <br /> Stortnwater Site Plan <br /> I Everett Communiry College O Q � O <br /> Topper Parking Lot 24 <br /> 208221.30 <br /> � ?�R <br />