My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1120 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
1120
>
1120 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 6:51:17 PM
Creation date
1/23/2017 6:49:40 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1120
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 24, 1974 <br /> cirr o� <br /> everett <br /> C�TY H1LL � 259.BE05 <br /> EVEPETI, WAii11NGTON <br /> Robert Finke sa=�� <br /> 1,::.!'[CTIOti LCPIF:MCM1T <br /> 1120 Broadwav Avenue <br /> Everett, Wn 98201 <br /> Dear hir. Finke: <br /> A Building Officials Hearing was held on F�prii 18 , 1974 <br /> relative to the matter of the unsafe buildings at 1120 <br /> - Broadway Avenue, commonly known as 1Qorth Gate h:otel. You <br /> were present at that meeting. <br /> It was determined by the Building Official, at that time, <br /> that the buildings in question were a potential � hreat <br /> to the community. The IIuilding Official further order.ed <br /> that the structures be demolished, subject to the ,`:ollocaing <br /> conditions: <br /> 1. The owner is hereby granted permission to <br /> demoiish the structures by his own methods <br /> provided the demolition work complies �;ith <br /> all applicable city codes and ordinances . <br /> 2 . The owner is required to obtain a demolitio�: <br /> permit within one week from the date of thi:; <br /> notice and to begin work within ten (10) day� <br /> from the date of this permit. <br /> 3 . The demolition work must be completed, to the <br /> satisEaction of the Inspection Department, on <br /> . or before July 31, 1974 . Additional time <br /> will only be granted by the Building Official. <br /> 4 . The garage structure can remain on the site <br /> with the stipulation that it must be brought up <br /> to the present building codes if it is to be <br /> occupied or used in any manner. The repair or <br /> demolition of this structur� must be accomplished <br /> within one year from the date of this notice. <br />
The URL can be used to link to this page
Your browser does not support the video tag.