My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 BROADWAY 2018-01-01 MF Import
>
Address Records
>
BROADWAY
>
1205
>
1205 BROADWAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2018 3:45:09 PM
Creation date
1/23/2017 7:12:31 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1205
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ^ !� <br /> �u� <br /> �� �d � <br /> � � <br /> ,��,R. <br /> P.O. Box 1299 • Everett.WA 98206 • (206) 258-3667 �n-na aGrzaot�z <br /> � [� C� � � � � � <br /> � <br /> May 15, 1989 MAY 16198� <br /> To: City of sverett Buildinq Department �y�� gUILDING DEPT. <br /> � Attnd: Ben Edwards/Ren Jackson/Bob Owens/Gene Lilley <br /> Re: Pre-construction meeting Welcome Motor Inn <br /> Gentlemen: <br /> As per your request I have summarized major topics of the meeting <br /> held Friday May 12 , 1989. <br /> 1) GWB ceiling details : Contractor to provide details of <br /> rated assemblies as suggested by Ren Jackson. <br /> Information to follow at later ::ate. <br /> ` 2) Electrical: Use of Romex will not be allowed according <br /> to Electrical InspE�ctor . Rodgers Electric will work out <br /> final agreement with City. <br /> 3) Plumbin4: PVC waste with Copper water piping will be <br /> acceptable - downspout drains in crawl space will also be <br /> cavered under pl�mbing division. <br /> 4) Inspections: 210 special inspections will be required by <br /> independent labs , unless field inspector suspects <br /> potential problems such as sub-standard soil conditions, <br /> etc. Building Inspectors to be scheduled a minimum of 24 <br /> hours in advance. <br /> 5) GWB at Shower Units: Ken Jackson to research subject and <br /> advise contractor oi acceptabie methods . <br /> E) Foundation Venting: Contractor to make propos;al to Ben <br /> Edwards for. his approval. <br /> 7) Shear wall requiremer.t: Ben Edwards to :eseacch subject <br /> and advise contractox of acceptable methods . <br /> 8) Roof Venting: Contractor to make proposal to 13en EGaards <br /> for his approval. <br /> 9) Post Beam Construction: No special bracing required. <br /> 10) Ritchenette Unit Layout: Ben Edwards will review <br /> ravision and advise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.