Laserfiche WebLink
--u:-._ <br /> � <br /> CLOSED CM WORK ORDERS REPORT <br /> Total Utility Maintenance Management System <br /> 10/10/1994 Page 1 <br /> --------------------------------------- <br /> Date Range : 10/O1/1992 - 10/04/1994 ' <br /> CM Work Order Range :<Blank> - 8405�321080229 Pattern :7101096750143 <br /> Item Range :<Hlank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> =____________________________________________________ <br /> -------------------------- <br /> CM WORK ORDER ID: 7101096750143 Title: REPAIR 1223 - BROADWAY <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: SS1795M066 -- SEWER SERVZCE <br /> Location ID: -- <br /> Program 710 Function 109 Activity 675 .. <br /> Date Completed: 09/20/1994 <br /> Overall Craft: <br /> Issued: 09/16/1994 Issued by: HDA Assigned to: <br /> out of Service? NO �riority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: HL <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ --•--------- ---------- ---------- <br /> SUP1 AGA AHLES, GREGORY A. 0.00 16.00 331. 04 <br /> UL CJE CASE� JAMES E. 0.00 10 .00 136.70 <br /> UL HDN HARRIS, DANIEL N. 0.00 2.00 28.70 <br /> HEO MCC MAGEE, CARL C. 0.00 16.00 303.20 <br /> UL WTE WESTVANG, TERRY E. 0.00 16. 00 229.60 <br /> Total Labor Cost: 1029.24 <br /> Materials: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. SAG 09/20/1994 1 10.87 <br /> COUP42300247 COUPLING 4" CONr X 4" Cl/PL 09/20/1994 1 2.54 <br /> ELIA42303047 ELL 4" 45 DEG SP X GASKETED 09/20/1994 1 0 2. 14 <br /> N/A TOP COARSE (ASSOC) 09/22/1994 1 L�1 01.63 <br /> N/A C.D.F. (ASSOC) 09/23/1994 lry�� 253.57 <br /> PIPE42304147 PIPE 4" PVC SEWER 09/20/1994 3 1.50 <br /> PIPE44304247 PIPE 6" PVC SEWER 09/20/1994 4 5.40 <br /> PLUG44307747 PLUG 6" (PVC) SEWER BELL END 09/20/1994 1 2.42 <br /> REDU46303747 REDUCER 8" SP X 6" GASKETED 09/20/1994 1 14.64 <br /> WYE044307047 WYE 6" X 4" ALL GASKETED 09/20/1994 1 8.78 <br /> Total Material Cost: / y�429 <br /> Vehirles: <br /> 1D Description Date ' Aours Cost <br /> ------------ ------------------------------ -------- ------ ---------- <br /> V2048 PICKUP GMC S15 89 09/19/1994 8. 00 36.00 <br /> V2048 PICKUP GMC S15 89 09/20/1994 6. 00 36.00 <br /> V2086 DODGE 1/2 TON '91 09/20/1994 2.00 9.60 <br /> V2113 91 CHEV 1-TON 09/19/1994 8.00 46.40 <br />