My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1625 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
1625
>
1625 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 9:51:19 PM
Creation date
1/23/2017 9:49:38 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1625
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( h� KI.EINFELDER <br /> i <br /> � removal and disposa] of' the Class II soil. Further reconunendation regazding il�e site <br /> development criteria is presenled in }:leinfelder Geotechnical Report, daled May 30, 2004. <br /> � 9.0 LIn1ITATIONS <br /> ` Pl�ase I ESAs Update and Limited Phase II substtrface soil chazacterization are non- <br /> t <br /> comprchensive by nature and aze urdikely to identify all c:nvirontnental problems or eliminate all <br /> � risk. This report is a qualitative assessment. ICleinfelder ofTers a range of investigati��e and <br /> engineering serviccs to suit the needs of our clients, including more quanlitative investieations. <br /> � Altl�ough risk can ne�•er be eliminated, more detailcd and extensive investigations }•icld more <br /> information, which may help you understand znd betler manage your risks. Since such detailed <br /> � services iuvolve greater expr.nse, �ve ask our clicnls to participate in identifying the levcl of <br /> sen�ice, ���i�ich �vill provide them wiil� an acceptaUle ]evel of risk. Please contact the signatorics <br /> of this report if you�r•ould like to discuss this issuc of risk further. <br /> � Kleinfeldcr performed the Phase I �SA Updale in accordance with our contract nroposal (I�'o. <br /> � O10011tPOP), subsequently appro��ed by you as our client. \To wananty, either express or <br /> � implied is made. �m�ironmental issues not specifically addressed in the report ���ere beyond the <br /> scope oCour work and not included in our evaluation. <br /> � <br /> Land use, site conditions (both on-site and ofF site) and other factors will change over time. <br /> � 5ince site activities and regulations beyond our control could change at any time afier the <br /> completion of ilus report, our oUscrvations, findings and opinions ca�i be considered valid only as <br /> � of the date of the site visit. <br /> fUi evalualion of business environmcntal risk associatcd ���ith the parcel(s) was nol included in <br /> IKleinfelder's scope of�vork. The LSA Update does not incorporate non-scope considerations, <br /> " such as radon, lead-based paint, lead in drinking ���ater, wetlands, regulatory compliance, cultural <br /> � and historic resources, industrial hygiene, health and safety, ecological resources, endangered <br /> species, indoor air quality, and high voltage po���erlines. <br /> 1 Provided that Kleinfelder's report is still reliaUle (as determined by Kleittfelder, Inc), Kleinfelder <br /> may issue a tlrird-party reliance letter to a party that Client identifies in ��Titing under the <br /> ifollo��7ng conditions: that the iliird party, induding C1ienYs successors and assigns, by sucl� <br /> reliance, (1) aeree in��Riting to be bound by Kleinfelder's Tenns and Coaditions a�id (2) agree to <br /> I <br /> I .133w�sGA�laoar,aoc raco �o ou� <br /> � Cop�richt 7004 F:L^infcldcr lnc. I Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.