My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1825 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
1825
>
1825 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 3:26:43 PM
Creation date
1/23/2017 10:47:43 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1825
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pabtic worlcs Departmmt <br /> Utilitles Diviaion,3200 Cedar Street <br /> COST ESTIMATE SHEET � p�,,, Everett,Washtngton 98201 <br /> ��� U (42�257-8800 <br /> �" / �✓/ <br /> Receipt # �(1���i� Date Paid <br /> ✓ Cost of Work Order 8,183.00 Work Order 11 <br /> G'ost of Service Order Service Order# <br /> Contact Person Gary O'Leary(ArchiteCt) Telephone N 425-259-3161 <br /> Requested By Kirk Brooks Date of Reqaest 12-3-99 <br /> Properry Owne�(name) Bertell Drug Co. <br /> Charge Cost to(name if different than owner) <br /> Address 4727 Denver Ave So Ciry Seattle Zip 98134 <br /> Installation Location 1825 Broadwey <br /> Installation rype/description/sizdetc. i1 —12" x 6" and 6" DCDA Installetlon in veult. Expose 12",hot <br /> tap and instail control valve. Excavat�tor, and install vault and DCDA. Make ffnal connection. , . <br /> ❑ The following estimate is based upon the Utilities Division providing all lebor, equipment, materials, <br /> restoration,and final hook-up. <br /> �lease noNfv the Ciri of Everett Utllitla Division 10 workin¢davs in ndvance of reauired installatlon date to <br /> allow[or schedulina and oarts orocurement <br /> Whenever the �tlmated cost b not su�cient to cover the Wtal expease tor labor, matettal, equipment ttnhl and <br /> admiaistraUve costs, the de6cit shall be charged to the property for which mch Installotlon was made and the owner <br /> thereof,and prov�.ied Curther,that any excess payment ahall be returned to the person applying for the installatloa <br /> �Depusit must be paid prior to ordering parts or scheduling work. <br /> ,j�/ 1�R METERS 3"AND L4RGER MAYHAVEA SIX TO 10 WEEKLEAD TIME <br /> cc: Bldg.Permit Center <br /> Ci:ir Olivers <br /> Mr�terial . 4,473.00 Tom Thetford <br /> L,P.bor and Benefits 2,700.00 Kirk Brooks <br /> Gordon Witcher � <br /> Equipme�t Rental 1,010.00 Dan Laweil i <br /> TOTAL S8,183.00 Stsn Mitchell �I <br /> Paul McKee <br /> Gecry Crum <br /> Alan Locke <br /> Prepared by: taerr Cru Q��-(.C�^ Daee Fsc. <br /> Accepted by�an�n4.� F-1 tJ�\ Preoated: Repmsenting; <br /> 12-7-99 <br /> ESTT�tATE GOOD FOR 6 MONTHS <br /> c�:e�u�xu��e�n <br /> y of�_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.