Laserfiche WebLink
> <br /> , <br /> �dNA(�� <br /> CIVIL ENOINEERINO,LAND PUNNINO,SUfNEVING.ENVIRONMENTAL SERVICES <br /> mP � '�^�►��Z <br /> ', <br /> �� ��� November 22, I999 <br /> yti„�Nsa� <br /> o� � CC0 �1 � �� <br /> Kirk Brooks � �U <br /> City of Everen N�V 2 3 1999 <br /> Public Works Department <br /> 3200 Cedar Street f I�t' U1= EVERETT <br /> Everetl, WA;E201 EnyinenrinpiPubllc Srrvtces <br /> RE: Bartell llrugs Resubmittal <br /> Our Job No. 6948 <br /> Dear Kirk: <br /> Enclosed are three sets of ihe revised civil plans for the ab�ve-referenced project at the northeast corner of <br /> Broadway and 19th Street, Everett, Washington. We have revised the plans in accordance with the enclosed <br /> City redlined review set as follows: I <br /> Sheet Cl: We have changed the name of the reference to ihe City of Everett Public Works <br /> Departrnent, as requested. <br /> h 2: Storm drainage from the building has been redirected to go to the catch basin at the <br /> northeast corner of the intersecdon of Broadway and 19th Street. Therefore, the exisung combined <br /> storm sewer stub ncrth of the intersecdon will not be used by the new building for roof drainage <br /> and/or sewer service. We have removed all applicable notes regarding the use of the eaisung <br /> cornbined sewedstorm drain smb. Gas traps have been called out on the new catch basins, as <br /> requested. <br /> Approzimately 2,000 square feet of paved area, represendng the drive-througfi portion north of the <br /> buildina, is sdll directed to go to new Catch Basin *Io. 2, which is located on the existing 8-inch <br /> combined storm drain/sanitary seever in the alley east of the building. Because all roof drainage is <br /> being directed to the system in Broadway, there is achtally a reduction in drainage area going to the <br /> combined system in the alley. Directing ihis minimal amount of drainage to the alley system avoids <br /> the con�actor having to make a deep cut into a minimum of three lanes of Broadway. <br /> Sheet C3: As previously menfioned, we have eliminated ihe connecdon to the e�cisung side sewer <br /> north of the intersection. We have labeled the connecdons to the water main to be installed by the <br /> City of Everett R'atcr Department at the developer's expensc,as requested. Also, we have called out <br /> a I-inch water meter rather than a f 1/2-inch, as requested, because the Water Departrnent does not <br /> have a I I/2-inch meter. The locafion of the ezisdng water main is shown on the plans according to <br /> I the as-builts supplied by the City of Everett. <br /> Sheet C4: Sediment bags have been called out, as requested, for the ezisfing catch basins in the <br /> roadway. T'he ezis6ng power pole east of the building has been relabeled to remain. <br /> 18215 72ND AVENUE SOU7H KENT,WA 980�2 (425)251-8222 (425)251-8782 FAX <br /> www.bargheusen.can <br />