My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1825 BROADWAY 2018-01-01 MF Import
>
Address Records
>
BROADWAY
>
1825
>
1825 BROADWAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2018 9:40:38 AM
Creation date
1/23/2017 10:51:04 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1825
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO POSTING ��n u s � <br /> Public Works Department <br /> ' Utilides Division,3200 Cedar Street <br /> COST ESTIMATE SHEET Everett,Washington 98201 <br /> (425)257-8800 <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order 11 <br /> � Cost of Service Order 345.00 Service Order# <br /> Contact Person Gary O'Leary(Arehitect) Telephone p 425-259-3161 <br /> Requested By Kirk Brooks Date of Request 12-3-99 <br /> Property Owner(name) Bartell Drug Co. <br /> Chazge Cost ro(name if oifferent than owner) <br /> Address 4727 Denver Ave So Ciey Seattle Zip 98134 <br /> Installation Location 1825 Br08dwey <br /> Inscallacion cype/descripcion/size/ecc. �12—DCDA detect meter installatton on 6" DCDA with remote read. <br /> •Contact Jfm Rice 425-257-8950 for installatfon. <br /> ❑ The following estimatc is based upon the Utilities Division providing all labor,equipment, materials, <br /> restoration, and final hook-up. <br /> Please_noHFy the Citv of Everett UNIiHes Division 10 workine davs in advance of reauired installation date to <br /> allow for schedulin¢and oarts orocurement <br /> Whenever the estimated cost is not sufticient to cover the total expense for labor, material, equipment rcnWl and <br /> administrative costs, the deficit shall be charged to the property for which such installadon wai made and the awner <br /> thereof,and provided furtheq that any excess payment shall be returned to the person applying for the insta0atloo� � <br /> •Deposit must be paid prior to ordering parts or scheduling work. <br /> WAT..FR METERS3"AND LARGER MAYHAVEA SIX TO 10 WEEKLEAD TIME. <br /> cc: Bldg.Permit Center <br /> Clair Olivers <br /> Material 220.00 Tnm Thetford <br /> Labor and Benefits 80.00 Kirk Brooks <br /> Gordon Wi�chcr <br /> Equipment Rental 45.00 Dan Lowell <br /> � TOTAL S345.00 S�an Mitchell <br /> Paul McKee <br /> Gcrry Crum <br /> Alan Lockc <br /> �� <br /> Prepared by: Ger Crum _Date Est. <br /> Accepted by: Prepared: Representing: _ <br /> 12-7-99 <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> fw¢v.Bmc:1�ISIJMNI <br /> 2 O� 2 <br /> m <br />
The URL can be used to link to this page
Your browser does not support the video tag.