Laserfiche WebLink
Bob Sor en <br /> From: Jeanne Meizger�metzger@frontier.com] <br /> Sent: Tuesday. November 06, 2012 1228 PM <br /> To: Bob Sorgen <br /> Subject: Re: COST ESTIMATE SHEET1.docxsidewalk.docx <br /> 'llianks. 1 ��ill put the signed cost estimate authorizing renair in the mai� in the ncxt cuupie of da�'s. Or 1 can <br /> send a pdf of the signed estimate by email. \1'hichc�cr �ou prcfer. <br /> On Nov 6, 2012, at 11:��1 AI�9. Bob Sorgen �crotc: <br /> Yes that is correct <br /> From: Jeanne Melzger [mailto�imetzaer�frontier.com] <br /> Sent: Tuesday, November 06, 2012 11:40 AM <br /> To: Bob Sorgen <br /> Subject: Re: COST ESTIMATE SNEETl.doasidewalk.docx <br /> 13ob: Thank }'ou for thc claritication. So just to bc surc 1 assumu ihat mcans thc nmount �ou cstimatc for thc <br /> side�i�alk ai�d asphalt to park lot Uchind siden�alk �vill not ha�e to be paid until in 2013 ��licn �ou complete thc <br /> rcpairs. Also that the work��ou dc m', making tcmporary repairs ��'ill bc �t no cost to us. thanks. .leannc <br /> i�ictzger <br /> On A'ov 6. '_012, at 11:32 AA9. ;3ob Sorgen �vrotc: <br /> That has to be done when the sidewalk rcplacement is done, howevei if there is a need for temporary repairs in that <br /> area we will do those at this time also. <br /> Code enforcement is satisfied that you have complied with their order to correct the violation by working with public <br /> works to replace the area in question. <br /> From: Jeanne Metzge� fmailto•imetzaerCaFrontier.com] <br /> Sent: Tuesday, November 06, 2012 11:14 AM <br /> To: Bob Sorgen <br /> Subject: Re: COST ESTIMATE SHEETl.doasidewalk.docx <br /> Ylcasc clarily tl�at that you ��ill do thc rcpair on thc asphalt apron Uetwecn cxisting sidc���alk and parking lot that <br /> �cas noted by Kevin Pagerstrom as a code violation at the time that you arc repairing the potholes. I assumed <br /> th.�t ���as the case whcn you gave thc bid of�291.50 on thc inst�llation linc on thc cost cstimotc shcet.. Uut <br /> �canted to confimt before I sign off on the cost estim�te. <br /> Un No�� 6. ?012. at 10:55 AM. Dob Sorgcn ��Totc: i <br /> Hi Jeanne, Here's the estimate for the sidewalk work that we talked about today,you just need to sign where it say's <br /> accepted by: at the bottom and send it back to me at, Public Works,City of Everett 3200 Cedar ST Everett WA. 98201 <br /> Attn: Bob Sorgen <br /> Due to our present work load and the deteriorating weather conditions we will install temporary repairs to the potholes <br /> along the street and schedule the sidewalk work for spring of 2013. <br /> i <br />