My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2411 BROADWAY 2018-01-01 MF Import
>
Address Records
>
BROADWAY
>
2411
>
2411 BROADWAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2018 1:26:41 PM
Creation date
1/24/2017 1:44:39 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2411
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC—t7-2001 09:36 AM PUGETNEST.COMST. 423 T�2 5513 P.02 <br /> f/�' /�� <br /> _ .Sov :— <br /> . � MAYES ��� ��. :,�,.��,�.: :-.w <br /> �.�, <br /> ;;t�.�c,�t„ . H.�a.w��u <br /> on att.��t r.wo <br /> W�15.7�6.7737 <br /> MTENo.; E7329 ,�sa�mn■wa <br /> ProJ�ct: TEXACO FJ(PRE53 LUBE s�.�a <br /> Addross: 2d'1 Broadway Ave., Evetstt,WA T'°"" "'"°"'p <br /> P�rmit No.t BDiOl0081 E0109-064 b,t�s�wim� <br /> ��w on�e. <br /> Ovmer. Kevin McCallister m++rc�aa nm. <br /> Archited: TRMI s'�it°0 <br /> PonYM OR 9727 t <br /> Engineer: TRMI pnso�za,.is,s <br /> Contractor: Puqet West Corporafion `■��+�m <br /> Page 4 <br /> Date: i1112i01 <br /> Weather. Cloudy <br /> Inspection; Masonry <br /> Inspected rein(orc�ng and observed masons grout soiid 4' to B' lift of building. Relnforcing was <br /> found to con(orm to sheet 2 anC rebar placing drawings. Walls grouled with Smokey Foint <br /> Concrete Mix q4AD (7-sack 70/30 pea/grevel mix)and Consolidated with vibraror. <br /> To lhe best of our knowledge, items inspetted this date are in accordence wilh approved plans <br /> and specificatlons. <br /> INSPECTOR: Tom Cain <br /> 1: <br /> Date; 11120l01 <br /> Weather: Cloudy " <br /> Inspection� RIM <br /> ARived onsite as requested for re•steel and qrout placement inspections ot building walls from <br /> B'to 12'. Re-steel appears�o be p�aced per drawing details, however it does not appear thal <br /> walls have been proR�cled trom rain. CMU walls appear to be salurated i�side and outside witY� <br /> anywhere from a trace to 1-y:'of standing water inside of cells. Chuck Morcow(Puget West) <br /> was notified of conditions and conlractor elects to place grout. UBC required CMU walls to be <br /> protected irom weather, Masonry contractor placed (6) cubic yards of Smokey Point S8G Grout <br /> Mix tf400 by pump and consolidated mechanically. � <br /> NONCONFORMING CONDITIONS/CORRECTIVE ACTION TAKEN: <br /> See body of:eport. CoMractor could not provide a phone number ot Ihe structural engineer for , <br /> his notification. i <br /> INSPECTOR: Mark McBride <br /> Revlawed by: <br /> ark . us , P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.