My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2608 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
2608
>
2608 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 3:06:52 PM
Creation date
1/24/2017 2:15:30 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2608
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e ruary i . <br />Tom Kcenig <br />2608 Broadway <br />Everett, WA 98201 <br />v�.ic wo�rs �- <br />ENG/NEER/II�G / PUBL/G SERI/ICES DEP14RT1NENT <br />RE; Owner: Koenig <br />Job Address: 2608 Broadway <br />Plan Check No: B0302-005 <br />Dear Mr. Kcenig: <br />In response to your application for a construction pertnit, your plans have been examined and you are <br />advised that the issuance of a permit is being withheld for the reasons listed below. These comments <br />address building issues only. Additional revisions, or additions, may be requimd by other departments <br />(such as Utilitics, Planning or Fire). All rcferences refer [o the 1997 Uniform Building Code, as <br />amended by thc Siate of Washington and/or Washington State Energy Codr„ 2001 F.�1i[ion, unless <br />stated othenvise. <br />In order for the processing of your application to continue, it will be neccssary to provide the <br />Building Division with two complete new sets o( drawings reflecting the corrections requested. <br />1. The proposed cmergcncy exit door appears to be closer than 5 ft. from a property line. This is <br />prohibited by UBC Section 503.2.1 and Table 5-A. The door could come uut of thc front of <br />the building and be in compliance. <br />2. Complete construction details and spccification are requircd for the aluminum roof and <br />supports. The roof appears to be supportcd by thc cxisting caves. If this is the case, it must bc <br />vcrificd that the ea�•cs can support thc new loading. [nclude a detail for the support of thc <br />insulation. <br />3. The foundation plan indicates that thc new roof will be supported by aluminum posts. If inis <br />were the case, the posts would be rcquired to be protected by onc-hour firc-resistivc <br />construction. UBC 503.2.1 and Table 5-A. A detail would bc rcquircd along with a testing <br />agcncy identification number. <br />Plr.ase prepare a msponse Ictter showing whem each item in this corrcction lctter is addressed on the <br />plan set. <br />Upon resubmittal of the drawings, your application will be given prioriry and plan review will <br />recemmcnce. <br />AI1 requircd submittals shall be of sufficient detail and contain sufficient in�ormation to ensurc that the <br />proposed swcwre will be constructed in compliancc with all adopted codes. <br />Sincerely, � ' '���I L'^ <br />` 11' <br />� v <br />Steve Millcr <br />Associatc Engineer <br />LI�/S003DfDl/1'I-V[f:MSiRtN111LR�B070:tI05i1f01 BROADw'AY� <br />CITY OF EVERETT • 3200 Cedar Slreet • EveretL WA 98201 •(425) 257-8800 • Fax (425) 257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.