Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br /> Total litility Maintenance Management System <br /> 02/09/1995 Page 1 <br /> --------------------------------------------------------------------- <br /> Date Range : O1/09/1989 - 02/07/1995 <br /> CDI W�rk Order Range : 0810800810001 - 'W2664-30-321Pattern :7101236710006 <br /> Item Range :<Blank> - WW22020001 Pattern :* <br /> Program ALL Function ALL A�tivity ALL • <br /> --------------------------------------------------------------------- <br /> CM WORK ORDER ID: 7101236710006 Title: REPAIR 3211 - BROADt4AY <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: -- <br /> Lucation ID: -- <br /> Program 710 Function 123 Activity 671 <br /> Uate Completed: 02/07/1995 <br /> Overall Craft: <br /> Issued: O1/17/1995 Issued by: HDA Assigned to: <br /> Out of Service? NO Priority: Tr�vel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: o hours <br /> Status: HL <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> i UL NCR NIETHAMER, CHARLES R. 0.00 5. 00 67.20 <br /> HEO SDD STECHER, DANIEL D. 0.00 11. 00 211.97 <br /> EO SR SIERRA, RAMUN (NMI) 0. 00 13 .00 ____240_89 <br /> Total Labor Cost: 520.06 <br /> Materials: <br /> ID Description Date p Used Cost <br /> ------------ ------------•------------------ -------- -------- ---------- <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. SAG 02/02/1995 1 1J.98 <br /> ELIA44303647 ELL 6" 22 1/2 DEG SP X GASKET 02/02/1995 1 3.77 <br /> PIPE44304247 PIPE 6" PVC SEWER 02/02/1995 3 4.29 <br /> TEE044306047 TEE 6" ALL GASKET (PVC) 02/02/1995 1 9.03 <br /> Total Material Cost: 28. 07 <br /> Vehicles: <br /> ID Description Date Hours Cost <br /> ------------ ------------------------------ --`--�-- ------ ----- <br /> V2133 84 DODGE 1 TON 02 O1 1995 5. 00 24. 00 <br /> V22'� 91 FORD F800 DUMP 5 YARD 02/O1/1995 5. 00 56. 50 <br /> V22:: . 91 FORD F800 DUMP 5 YARD 02/0�!1995 8. 00 90.40 <br /> V350'7 88 CASE BACKHOE 4X4 G2/O1/1995 5. 00 214 . 00 <br /> V3507 88 CASE BACKHOE 4X4 02/02/1995 6.00 256.80 <br /> Total Vehicle Cost: 641. 70 <br /> � <br /> :�ork Description: <br /> ----------------------------------------- <br /> REPLACE EXISmING CB WITH CB-15 WITH FRAME AND GRATE. <br />