Laserfiche WebLink
. . � . . . . . . . . <br /> Erosion co�cul measures should be impkmented during all stages of coastnu�tion to ensure tLat <br /> sedimem-laden waters do not leave this site. These measures might include but are not be <br /> limited to the folbwing: <br /> • From October 1 to April 30, no soils may rert�ain exposed for aare ttan 2 days. From May 1 <br /> to September 30,no soil may remain exposed for more than 7 days. <br /> • Materials,equipment,and other resources shall be on site nt all times, in adequate quazrtities <br /> to immediately stabilize all soil. <br /> • Denuded areas shall be Govered by mulch, sod,plastic,or otl�et BMP's as per the City of <br /> Evereri's �tormwater Management manual. <br /> • Soil stockpiles shall be stabilized or protected with sediment retentan BMPs within 24 hours <br /> of formation to prevent soil loss. <br /> • Grading and coc�struction shall be timed and conducted in stages to minimi�e soil exposure. <br /> • The contractor shall establish a permanent vegetative ground cover to cornrol soil erosan <br /> and to survive severe weatt�er conditions on all areas of land disturbance not othenvise <br /> permanently stabilized by impen7ous surfaces ot othr.r means. <br /> • The contractor shall maiutain and repair as t�ecessary atl temporary and pernianent emsion <br /> and sodimentation control BMPs to assure tk�eir continued perfomiance through consttudion <br /> acceptance and extending to the release of all associated wananty security and mauitenance <br /> security. <br /> • Before performing any grading or clearing,the contractor shall mark, in the field, the limits <br /> of all proposed clearing and grading, critical areas and the'v buffers,trees to be retained,and <br /> drainage courses. <br /> • The contractor shall protect storm sewer inlets receiving storm water runoffduring <br /> construction so that water will not enter the inlet without first being 6ltered or othenvise <br /> treated to minimize the amount of sediment entering the inlet. <br /> � The contractor shall route storm water nuaff from disturbed areas of the site through <br /> sediment ponds,traps or other sediment retention BrdPs prior to discharge from the site. Tt►e <br /> BN[Ps shall be installed as the first step in grading,and shall be in operatan before any other <br /> site disturbance occurs <br /> • The contractor shall preservc a vegetated buffer strip around the lower perimeter of the site. <br /> . The wntractor shall design and construct temporary and permanent BMPs adequate to <br /> prevent erosion of outlets, adjacent stream banks, slopes and downstream reaches. <br /> • The contractor shall implement fully the erosion and sedimentation contml plan at each stage <br /> of site development. <br /> 4 <br /> � <br />