Laserfiche WebLink
f <br /> GILBERT�ON <br /> CONSTRUCTION <br /> 6216� 145th Ddve NE • lake Stevens,Washington 98258 • (206)334�U891 • fax:�360) 691•5051 � <br /> Datc: 2/25/97 <br /> Bid for: Bob Sullivan <br /> Address: 3614 1/2 Droadway <br /> Everett, WA <br /> Phone: 258-2829 <br /> Job Description: Gi(bertson Construction proposes to re-establish the structural integrity <br /> of Pyramid Design building located at 3614 1/2 IIroadway. <br /> Scope of Work: Remove carpet and baseboazds. Carpeting cannot be re-used due to <br /> it having been glued down. Haul off and dispose. <br /> Jack up and level beams. Install temporary posts. <br /> Cut slab and remove footing azea 36" x 36"on two interior areas <br /> Cut slab ur.der front wall at post locations also at 24"x 36" <br /> Dig out and pour footings 10"deep w/ 12"#4 re-baz matt <br /> � � � � (2� D Pootings to have 4/24"re-bar protruding to bond slab overlay <br /> �•� Haul off dirt and old concrete. <br /> I F R 8 7 �y�� Remove Sign and Awnings from front of building with boom truck. <br /> �..... <br /> ...,,,,,, " Front wall is racked from lack of sheer strength. <br /> � �ITY OF EVERET7 Demo front wall and haul offdebris. <br /> Buitdin^r Divisian Re-build front wall with 2x6 const., R-19 insulation, solid 1/2"sheathing <br /> Add shecr walls at each corner as braced wall panels <br /> Ir.clude t:i�o 6'x5' Milguard 920 series Hindo���s <br /> Re-install existing store doors <br /> Add new siding and paint to match <br /> Re-hang sign and awnings with new support system w/boom truck <br /> Prep for new interior slab. Not cost effcctive to fix old slab. <br /> Pour interior slab with fiber-mesh additive <br /> Slab to have positive contact with ftiotings and re-baz <br /> Shcetrock interior of front wall w/ 'i/8" type X and tape smooth wall <br /> Tnstall new posts and moldings <br /> Paint effected areas <br /> Install new commcrcial carpeting <br /> Clean up tivoughout constructior�process and final cleaning <br /> Inspcct roof for damagc <br />