Laserfiche WebLink
, <br /> • INFORh1ATlON FOR DEVELOPER: <br /> The following infortnation is provided for the developer's bcnefit. 7'hese are not SEPA <br /> conditions but are associated with other laws or requirements. All requirements aze preliminary <br /> in nature, and an;based upon the preliminary site plan and the ordinances in effect at time of <br /> submittal for SEPA review. The proposal must comply with all ordinances in effect at t6e <br /> time a complete building permit application is filed, iecluding those not specifically set <br /> forth herein. (Lxception: For vesting under the Zoning Code, please refer to Section 44 of the <br /> Zoning Code). Contact the Planning Depariment for information rcgarding appeals processes for <br /> the requirements listed in this document. <br /> 1. A Public Works Permit is required for this project. Detailed drawings in accordance with <br /> City Design and Constructior. Standards shall be submitted to the Public Works <br /> llepariment, showing site parking layout, landscaping, utilities, storm drainagc, <br /> temporary constructiun erosion control, and all required improvements in the public right- <br /> of-way. Public Works Department approval of these drawings is required prior to any <br /> permits being issued. All improvements shall be completed and approved bcfore the <br /> Occupancy Permit is issued. <br /> 2 My grading/fill on this site shall be done so as to not impact the surrounding propeRies. <br /> 3. This project must comply with the current City of Everett Building Code. <br /> 4. Removal of existing driveways and relr�cation of driveways, along with utility installation <br /> will require construction of a new side�valk along this property's Broadway and 3'7`" St. <br /> frontage. <br /> 5. City streets and alleys are to be kep[clear of dirt and debris at all times during <br /> construction. Dust suppression and street cleaning must occur as directed by the Public <br /> Works Inspector. <br /> 6. Temporary erosion control measures for construction activiry must be operational prior to <br /> commencement of any cicaring or canhwork. <br /> 7. The building finished tloor clevation and the elevation of all othcr important <br /> structure/areas shall be above the potential hydraulic �rade line at the side scwer location <br /> or a grinder pump will be required for the connection. <br /> 8. Thc van accessiUlc parking spacc must bc sized to mcct ADA requircments. Sidewalh <br /> along north side of building must be widencd to accommodate bumper overhang from <br /> aulos parked in spaces 1 through 4. <br /> 9. The fucling areas and tanker transfer areas shall be designed and constructed in <br /> accordance with all applicable Ciry standards regarding spill control and containment. <br /> 10. Fire Department Access - O.K. as shown on the site plan reviewed. <br /> 11. Prem�,se Identi fication - Premises shall be clearly identified by thc corrcct address at the <br /> street entry. Buildings shall be clearly identifed so as to be visible and Icgible from the <br /> 3/� <br />