Laserfiche WebLink
�.� <br /> everett INSRECTION REPOR'T �'':, <br /> � Address f <br /> Contractor ��1 --�-- <br /> pwner <br /> Date ����-- <br />� 7YpE OF I_ M1SPECTION REQUESTED <br /> ❑ BLDG: Pmt. No. ��`� U MECH: Pmt. No. _�— <br /> I - PLBG: Pmt. No. _�— <br />( ❑ ELEC: Prit. No. �--- <br /> ❑ Framing ❑Gas PiPi�9 <br /> I ❑Temp.Eiect. $�,�,all,Nailing ❑Consultation <br /> ❑ Footing G Shear Nailing ❑Groundwork <br /> p Foundation p Grid ❑Struct.Slab <br /> ❑ Ductwork ❑ Rough•In ❑ Final <br /> ❑Wood Stove p Service � —�� <br /> ❑ Masonry I <br /> PPROVAL ❑ PAh?�AL APPROVAL <br /> VIOLATION ❑ CORRFCiION R[QUIRED <br /> I ❑ �o� rr� ec� ti-s listed below'J�UST BE MADE before work can be ap�roved. <br /> ❑ Please contact inspeclor and arrange for appoinlment. <br /> ❑Was not able to pertorm inspection. <br /> �CALL 259•B610 F09 REINSPECTION—24 hour nctice required. <br /> THE PRE��SES PRIOOR TO OCCUPANCYE ISSUED AND POSTED ON <br />, �-- — <br /> / ����� e�_Date � <br /> Inspector <br />