My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3726 BROADWAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
BROADWAY
>
3726
>
BASE FILE
>
3726 BROADWAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 8:51:07 AM
Creation date
1/24/2017 7:42:53 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3726
Tenant Name
BASE FILE
Notes
SITE DEVELOPEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� PU6Wl'WORKSDFPAR'IMENT <br /> U6lides Division,3200 Cedar Street <br /> Everett WA 98201 <br /> 425-257-8800 <br /> Receipt N Dale Paid <br /> Cosl of Work Order Work Urder# _ <br /> ✓ Cost of Service Order 3,949.00 Service Order N <br /> Contact Person Pedro Deguzman Telephonc# 206 923-0590 <br /> Requcsted By Dennis Robcrson Date of Itequest 8-30A5 <br /> Property Owner(name) G8rt1Ut 360 HoldiDgs _ <br /> Char�e Cost to(name i(di((crenl lhan o�cner) _ <br /> Address 2717 Rockefeller Ave Ciry Everett Zip 98201 <br /> installation Location 3726 Broadway <br /> Instaliation rype/description/size/etc #4-4" fire serviee. Tap main, Fipe to vault and install DCDA <br /> fn vault Developer to supply/install vault to grade. Vault to be utilitfes 575LA with 57-TL-2-332P <br /> lid. Developer to sawcut, excavate and restore pavement. <br /> ❑ The following estimate is Uased upon the UtiliHes Division providing all labor,equipment, <br /> materials, restoration,and final hook-up. <br /> Please nolify thc City of Gvcrett Utilitics Division 10 working days in advancc oE required installation <br /> datc lo allow for scheduling and parls procurement <br /> �Vhenever the estimated cost is not sufficient to cover lhe total exyense for labor,material,equipment rental and <br /> adminislrative cosls, lhe deficit shall be charged to lhe property for which such installation was made and the <br /> owner lhercof, and provided furlhcr, Ihat any extess payment shall be retumed to the person applying for the <br /> installatian, <br /> *lleposit musl bc paid priar to ordering parts or scheduling work. <br /> WATER n1ETERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> cr. Dldg. Permil Cenler <br /> Malcrial 2,428.00 Mark Sadler <br /> Kirk Brooks <br /> Laborand Bcnefits 1,045.00 Gordon Witcher <br /> L'quipment Rental 408.00 RoUert Waddle <br /> A1att Wclborn <br /> T�x 68.00 PaulbicKce <br /> TOTAL $3�949.00 Gerry Crum <br /> Dennis Roberson <br /> Preparcd bq: Gerry Crum � ��' �r�_ Dale Gstimate Preparcd 9-1-05 <br /> Acccptcd by: Representing <br /> GSTIMATE GOOD FOR 6 DiONTHS S �� <br /> , i•,.i,�u_�<<,no��.,..,�:,.,un in.rsi a�„ _�(s of�, <br />
The URL can be used to link to this page
Your browser does not support the video tag.