My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3726 BROADWAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
BROADWAY
>
3726
>
BASE FILE
>
3726 BROADWAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 8:51:07 AM
Creation date
1/24/2017 7:42:53 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3726
Tenant Name
BASE FILE
Notes
SITE DEVELOPEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. OFF-SiTE ANALYSIS <br /> The existing 2.15 acre site g�nerally sheet dra�n� to Broadway A�-enue and evcntuall�� <br /> discharges to the existing City combined sanitary sewer I storm system. All dramage viill be <br /> discharged to the existing 36" storri/sewer main w�thin 38'" Street. This drain turns northward <br /> within the ailey between Broadway and McDougatl Avenue and thEn eastward within 37" Str�et. <br /> IV. EROSION AND SEDIMENTATION CONTROL BMP'S <br /> Erosion Ccntrol BMP's shali consist of a rock construction entrance, sill fencmg, and soil <br /> stabilization measures. A sediment pond has also been added at the northeast corner oi the site <br /> with a filtered discharge to the existing storm drain within Broadway Avenue. . <br /> Refer to Section 6 for the required Small Parcel Erosion Control BMP's and sediment pond <br /> caiculations. For erosion and sediment control design refer to Appendix B - Civil Plans. <br /> V. RUNOFF CONTROL BMP'S <br /> The project requires compliance with the 1997 City of Everett Stormwater Management Manual. <br /> Stormwater will be discharge to the combined sanitary sewer/storm drain lines within Broadway <br /> and 38'h Street. According to discussions with lhe City of Everelt,storm detention and water quality <br /> measures will not be required due to the use of the exisling combined sewer/storm system. For the <br /> on-site storm drainage system refer to Appendix B- Civil Plans. <br /> On-site storm drains have been sized to accommodate a 25-year/ 24-hour storm event using the <br /> Rational Method. See attached calculations and exhibits. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.