My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3726 BROADWAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
BROADWAY
>
3726
>
BASE FILE
>
3726 BROADWAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 8:51:07 AM
Creation date
1/24/2017 7:42:53 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3726
Tenant Name
BASE FILE
Notes
SITE DEVELOPEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' �� � PUBLIC WORICS DEPARTMINI' <br /> UtiliHes Division,3200 Cedar Street <br /> Everett WA 98201 <br /> 425-257-8800 <br /> Reccipt N Datc Paid <br /> Cost of Work Order Work OrdcrH <br /> ✓ Cost of Service Order 730.00 Service Order H <br /> Contact Person Pedra Deguzman Tclephone N 206 923-0590 <br /> Requcsted Uy Dennis Roberson Datc of Request 8-30-05 <br /> Property Owner(name) Gartlut 360 HoldingS <br /> Char�e Cost to(namc i(different than owner) <br /> Address 2717 Rockefeller Ave City Everett Zip 98201 <br /> Installalion Location 3726 B�oadway <br /> Installation type/descr;pHon/size/ctc. #6- 2" 1RR service. Developer to relocate aettedmeter box. <br /> ❑ The following estimate is Uased upon the UtiGties Division providing all labor,equipment, <br /> materials, resloration,and fuial hook-up. <br /> Plcasc nolify the City of Gvcrclt Utilities Division 10 working days in advancc of rc uired installation <br /> date to allow for scheduling and parls procurement <br /> Whenever lhe estimaled cost is not sufficienl lo cover lhe total expense for labor,material,equipment rental and <br /> administralive cosls, the deficit shal) be charged to the pmperty for which such installation was made and the <br /> owner lhcreof, and provided furlher, Ihat any excess payment shal! be returned to the person applying for the <br /> installalion. <br /> "Deposil must be paid prior to ordcring puts or sclteduling work. <br /> WATER A�ETEP.S 3"AND LARGT:R MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> cc Uldg. Permit Center <br /> h4atcrial Mark Sadler <br /> Kirk Brooks <br /> Labor and Dencfits Gordon Witcher <br /> �quipment Ren�al Rolmrt�Yaddle <br /> Matt Wclborn <br /> 'I'nx I'aul McKcc <br /> TOTAL $730.00 Gerry Crum <br /> Dennis RoUerson <br /> 7 � <br /> PrrparcJ by: Gerry Crum d�6•4�fr��)alc L•stimate Prepared 9-1-05 <br /> Acccptcd by: Represcnting <br /> �\. <br /> IiSTIPtATG GOOD FOR 6 D10NTHS <br /> s i•.i.u..�..���u�i,o.���...,,, �i�.i.m�i�,i i,.- ( of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.