Laserfiche WebLink
CITV OF EVERETT STORMWA7ER MANAGEMENT MANUAL <br /> l — <br /> � Ecology will maintain a lis:oCESC training and ccrtification providers at: <br /> <wµ�v.ecy.wa.gov/ptroqramsiwg/storm water>. <br /> Certificatio�shall retnain valid for 3 ycars. <br /> S'pecifications <br /> I. T6e CESCL shall havc authority to act on behalf of thc convactur or developet and shall be <br /> available,on aall,24 hours per day throughout the period of co�shuction. <br /> 2. The GSWf'PP shall include the name,telephone¢umber,(ax number,and address of the <br /> designated CESCL. <br /> 3. A CESCL may provide iiispection and compliance services for multiple constniction projects in <br /> the sa.mc gcegraphic region. <br /> Dutics and responsibilidcs of the CESCL shall incl�dc,but are not hmired to the following: <br /> 1. Maimaining permit file on sitc at all iimes which includes the GSWPPP and any associated <br /> pertnits and plans. <br /> 2. Directing BMP inscallation, inspection,meintenance,modification,and removal. <br /> 3. Updating all pruject drawings and the GSWPPP with chenges made. <br /> 4. Keeping daily records and inspectiou reporu. InsQection reports should include: <br /> a. Inspection dateltime. <br /> b. Wcathcr infortnation; general conditions during inspcction and approximate amount ef <br /> � precipitation since the last inspection. <br /> , <br /> c. Locations of BMPs inspected <br /> d. Locations of BMPs that need maintenance <br /> e. Locations of BMPs lhat failed to operate as designed or intPndcd,and <br /> f. I,ocations of where additional or different BMPs are required. <br /> g. Visual monitoring results,including a descnption of discharged stormwater. Thc <br /> presence of suspended sediment,turbid water,discoloration,and oil sheen shall be <br /> noted,as applicablc. <br /> h. My water c;uality monitoring perfocmed during inspcction. <br /> i. Gcneral comments and notes, including a bricf ducription of any BAdP repairs, <br /> maintenancc or installations made as a result of the inspection. <br /> 5. Facilitating,pazticipating in,and taking coacctivc actions resulting from inspections performed <br /> by outside agencies or the owncr. <br /> 3.2.22 BMP C161: Payment of Erosion Control Work <br /> Purpose <br /> As with any construction operation,thc contracror should be paid for crosion control work. PaVmcnt for <br /> crosion conhol must bc addres:ed during project devclopment and design. Mcthod of payment si;ould be <br /> identified in the GSWPPP. <br /> Volume II—Construction StormwaterPollution Prevention <br /> 3-34 <br />