Laserfiche WebLink
trrrorin�n•rioN ro�z rn.vr;i,o��ca: <br /> linginecring/Public 1Uorl:s Rcquircments: <br /> I. A Public 1Vorks Pcrmit is rcquircd for this projcct. Dctailcd dra�vings in accordance wilh <br /> City Design and Consiruction Standards shall bc submittcd to dic Public Wori<s Dcparlmcnt, <br /> showing sitc parking layout, landscaping, utilities, storm drainage,temporary cor.struction <br /> erosion conU'ol, and all requircd improventents in the public right-of-wny. I'ublic Works <br /> Ucpartmcnt approval of Ihcsc dra�vings is rcquircd prior to any t�crmiis bcing issucd.All <br /> II11�7fUVCO7COI5 SI18II I1C COtlI�]ICIC(I,approvcd miJ warranled bcfurc lhc Occupancy Pcnnit is <br /> IStiIIL•�. <br /> 2. I':uking ntus(bc per City Zoning Code aud City Dcsign and Cunstruction Slandards for <br /> bevclopmcnt. <br /> 3. This projcet must comply�vith thc aurrcnt City of I:vcrctt 13uilJing Codc and Sprinklcr <br /> Ordinancc. <br /> 4. Special clmrges for connection to the sewer and water systems in accordance with Ordinancc <br /> 19J8-94 and suhsequcut revision are applicable. These chargcs are based on projccled �vatcr <br /> usagc and can be substantioL Applicant is encouraged to obtain a copy of die Ordinancc and <br /> detcrminc cstimatcd chargcs prior to building permit npplicalimi.Thc lclual chargcs sliall bc <br /> computed by thc 1'ublic�Vorks Dcp.�rlmcn� per thc ordinance in effect at thc time and <br /> accarding to the in(ormation on thc:+pproved pinns nt the time of building permit issuancc. <br /> 5. Lack of comment on �hc plans submittcJ with thu application docs not cunstinrtc xpproval of <br /> thcsc plans. <br /> 6. Ciry strccis arc to bc I<cpt cicar of dirt and dcoris at all times during consu uction. Dust <br /> suppression and slrect cicaning must uccur as dircelcd by the Public \�l+orl<s Inspector. <br /> �. OIl-SILC NSIICI'lilain will be stuked within an eascment W Ihe Cily.The eascmcnt will bc <br /> submittcd to thc City prior to issuancc of permits. <br /> 8. As-builts of storm sc�ver,sanilary sewer,and watcr systems will he rcquired to 6c submiltcd <br /> per City Design and Construction Standards nnd Spcci(ications for Dcvclopmcnl. <br /> 9. All eaposeJ ground must be reseeded within 30 dnys of Ihe compiction of construction. If <br /> resccding is not practical duc to weathcr or scasonal problcros,thc ground must bc covercd <br /> with mulch as dircctcd by Il�e City L'nginccr. <br /> 10. Temporary erosion em�lrol measures I'or conslruction activity must be operational prior to <br /> conunenceuicnt uf uny cle.iring or earthworlc. <br /> I I. A Nct 'll•nEfic Mitigaliun I�ec of$58,500 is duc tbr this projcct. This tra(lic mitigation fcc is <br /> in addition to any direct improvcincnts required on this project, including nuy Gontagc <br /> improvcments along roadwnys and ahultiug the devclopcd propertics. <br /> �'/�3 <br />