Laserfiche WebLink
f•, <br /> ' PUBL/C WORAfS <br /> � �w�zoz-oi� <br /> ME1110RANDLfl�1 <br /> TO: Gordon Witcher <br /> FROM: Dave Voigt �,'�/ <br /> DATF: March 5, 2012 <br /> SUBJECT: Everett School District CRC — C+vi! Plan Review for Sewer and Drainage <br /> Plan review commcnts are summarized as follows: <br /> 1. Stortnwater Sitc Plan Report is satisfactory. <br /> 2. Drawings C3.2, C3.3, C4.1 and C4.2 contain somc Standard Drawings Cor scries SD400 (storm <br /> water) and SD600 (sewer) that are outda[ed. �1ost of these slandard drawings need to bc <br /> rcplaced with the Iatest edition. <br /> 3. Sewer system design is satisfactory subject to updated standard drawings per itcm 2.abovc. <br /> 4. Urainage system design is satisfactory, subject to updated standard drawings per item 2. above. <br />