My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5410 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
5410
>
5410 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 8:58:28 AM
Creation date
1/24/2017 8:58:12 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
5410
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. i � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#501. <br /> / 5. 1 Connect side sewer per City S�tandard#'s 601, EU2, 604. <br /> l� <br /> 6. Connect all rooftop downspcuts to the side seeaer. <br /> � Connect rooftop downspouts to the drainage system pro�ided for thi: lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout i�filtration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5' widr„ 2'deep and 25'long. See att2chment for <br /> more detaiis. <br /> � The contracto�must meet w�th the Public Works Inspector to discuss potential drainage rouling prior to <br /> beginning the project. Call Randv Allen at 425-339-7403 //Call Cliff Lindman at 425-339-7404. <br /> 10. Install erosion co�lrol measures ss determined by the Public Works inspector, such as:;ilt fence, straw <br /> bales, swales, or erosiun blankets. <br /> 11. Install erosion conlrol measures per City of Everett Standards for smail parcels <br /> � <br /> 12. Remove erosion control measures upon completion of!he project prior to fnal approval of the permit. <br /> 13.� All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lot. <br /> 14 No dirt, mud, rocks or debris to be lracked onto roadway. <br /> 15� No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br /> open for pedestrian travel. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A 8 306 on <br /> this proposal's frontage as directed hy the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everelt Stardard#307. <br /> 19. Pave driveway from th�front property line out to the street paving. <br /> 20. Pave to existing paving in alley. <br /> 21. Contact the Water District for connecting provfsions for this building's water and <br /> sewer services. <br /> 22. A catch bssin as per City Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 23. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br /> gravity Flow across the public right-of-way. <br /> 24. A sprinkler system is required for this building in compliance with the requirements of NFPA Standards <br /> 13D. <br /> � ; 1\ <br /> � _� ,_ � <br /> PWCanmenls 1 Revised 6!8111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.