My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5412 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
5412
>
5412 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 8:59:31 AM
Creation date
1/24/2017 8:59:12 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
5412
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: 5/3/2012 / <br /> PUBLIC WORKS PERMIT publicWorksPermit#: PW1205-002 <br /> City of Everett Public Works Department guildinp Permit#; C1203-006 <br /> 3200 Cedar Street <br /> ���� ��7 ' 'l�� Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee S: 5 25.00 <br /> Other 5: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRES�: <br /> JJONESINVESTMENTSLLC SAME <br /> 221G 204TH ST NW <br /> STANWOOD WA 98292 <br /> PHONE: 425308964G PHONE: <br /> TAX PARCEL IG ri 00500600003204 SITE ADDRESS: 5412 BROADWAY <br /> DESCRIPTION OF PROPOSED WORK: <br /> NE\N SFR <br /> Lot 3-Shortplat 1202-010-07 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. AII work shall be pertormed in accordance with the permit and current City of Everelt Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Connect side sewer per City Standard#'s G01, 602, 604. <br /> 5. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 6. The contractor must meet with the Public Works Inspector lo discuss potential drainage routing prior to � � <br /> beginning the project. Call Randy Allen at 425339-7403 �.., <br /> 7. Install erosion control measures as determined by the Pubtic bVorks inspector, such as silt fence, straw bales, � <br /> swales, or erosion blankets. � <br /> 8. Remove erosion control measures upon complelion of the project prior to final approval of the permit. O <br /> 9. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site. � <br /> No wasting of material is allowed on this building lot. <br /> 10. No dirt, mud, rocks or debris lo be tracked onto roadway. Z <br /> 11. Pave driveway from lhe front property line out to the street paving. Q ( <br /> � <br /> � <br /> 0 <br /> � <br /> TO POSTING ' � ( � ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned ownerlapplicant hereby agrees to hoid and <br /> save harmless Ihe City of Everett irom any and all claims tor <br /> damages, costs,expenses,or ca�ses o(aclion that may arise <br /> because of installalion and maintenance of the improvement <br /> or other righl-of-way use herelo app�ied for and turther agrees <br /> lo remove same upon notice from the City and lo replace <br /> Appr ed�f r C nst�uCt�on � DBte public property damaged thereby. <br /> � G�i'% _ i���—. P' — �� —� � <br /> INALINSPE� ION Date <br /> Approved as Constructed Signalure o(Applicant Dale <br /> WORK AUTHORIZED BY iHlS PEkMIT hiUST B�STARTED WIT111N Id0 DAYS OF DATE PERMR IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COPIPLE710N. TNIS P�-RMIT MAY BE CANCELLED BY THE qTY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.