My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5505 BROADWAY RECORDS STORAGE ONLY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
5505
>
RECORDS STORAGE ONLY
>
5505 BROADWAY RECORDS STORAGE ONLY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 7:22:55 AM
Creation date
1/24/2017 9:04:07 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
5505
Tenant Name
RECORDS STORAGE ONLY
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ihr E������ri�i. ,i:� in:;i�urr�l iri�in thr h.�rl: i,� ihc �call Ll��c�;. �cill hc I�J �i•ct I��ng tiir tl�c �r..i.�imuni <br /> r��,�ucJ wali hcight uf 1 G �ccL (If cunditions or gr�ding changcs rcyuirc wall hcights grcatcr <br /> ih,n I G fcct, the wall dcsign cnginccr, BGC, pllc should tn; contactcd to providc a dcsibn <br /> i��ision.) As thc wcst wall steps up the slopc from the low at the northcast comcr, the grid <br /> Icn��:��s ,u�y tx shortcncd to RO pcn:cnt of thc wall height as thc �vall hcight dccrcascs. "Ilic <br /> ���•ugrids must bc placed horizontally and at thc proper intcrvals as specified on ihc wall secu�m <br /> dctail. Thc maximum vcrtical spacing betwcen laycrs of geogrid rcin}'orccment shall be�4 <br /> inchcs. 'I'hc minimum 2d inchcs of embcdment malerial in front of thc wall must be excavatrd <br /> �lc��vn into nativc sedimcnts and thc cxcavation shall bc cut as closc to Qic facc of'thc �,,,II :��: <br /> �u�ssiblc such that minimal spacc IxtK�ecn thc wall basc:uid thc cmbcdmcnt soil occur:. <br /> I hc manufacturcr's ncommcndalions for placing and �ssemhling wall hlocks should hc <br /> (ulluwed at all timcs. 'll�c pmccss of placing rows of walls blocks, placing drain rock, <br /> b;ickfilling:uid compacting t!ie fill, .ind placing layers of geogrid reint'oreement ���ill Ix rr�,r;��c�1 <br /> ���:til achieving tFc planncd wall hcight. Eac1i l:�ycr of�tcogrid slintild hc tcmp�rarily �I;�E.r�l t�� :i <br /> t:�ut condilion priorto placing soil backfill �m t�,�, ��I�iL I�:rr��in;� �I�r �t����rriJ i:�ut ���ill i�:,lu�:� ili� <br /> ����irntial for post constructian wall movemrn�. <br /> l hc gcogrid choscn forthe wall ainalysis w:�s �u:na;�ri�_i �n�i ar.�l t�r� :iunc ���.,II hl��cl.� . t)th��r <br /> L,cugrid .utd hluck m:inuL•icturcn arc a�cc�laLlr: li<�( '- I,II� �.h�ml�i hr �i,nt;ictr�l tu :qi��t����� ;in <br /> cyuivaient �Ircnyth rc�,i�rid li��m thc cL���cn I.raml ;in�l �rril.� accc��iahilit�� �aitli ihc �i�r.�•ntal <br /> w,ill dt�sign. <br /> l�hc appro�im:itr 1: iuch :��nc iiunir�(iut�l}� hchiuJ thr «�:ill hlucks �vill cun.i�l ul�drain r���:k. <br /> I�his drain rock shall bc cican, I�rce-dr:�inin}�, cn�shcd rock with a m.uimum di�mictcr ol 1'�: <br /> inches. Pree-draining is defined as Iess than 5 pereent passing the No. 200 sieve when measurcd <br /> �m t hc minus N4lraction of the totul. Nea gravei or round, washed drain rock may not be uscd in <br /> Ihis ��•all drain zone. A 4 inch dimnetcr perforated drain pipe should be cmheddcd at thc base nl <br /> this drainagc column of rock 7'he piEx:dischargc should bc out the t'ncc or around the cnd uf ihr <br /> ��:dl at thc low point (ur points) ofthc foundation cxcavation. I�he Jischargc should thcn hr <br /> tii.htlincd to thc loc of thc slopc. IConsitc soils:uc uscd for swctural fill wilhin thc �v,ill <br /> h.�rklill zonc, it will bc ncccssary to cstablish a sccond:try"chimncy drain" bchind il:c <br /> icinfbrocd lill. If a cican, fi�ce-draining, imporled sand :vid gravel is used to conswct thc <br /> rcinfbrced wall 6il the chimncy drain ���ill nr�t be necessary. The need for a secondury dr:�in ,�ill <br /> 1��� dctermined at the timc of constrvction based on the perccntage of fines in the �aall b.irk til I <br /> ��,il being uscd. <br /> I l�c consWetion of the wall should be completed by a contr.�ctor with experienec in <br /> :unstruction c�f scgmcntal block wall systcros. 7'hc structural intcgrity dcpcnds on �n������ <br /> placcmcnt of wall system components and compaction of the wall back6lL A tcnrescntaii.r ��I <br /> this firm should providc ovcrsight during construction to vcriCy compliancc with thc design <br /> detail and for quality control purposes. It will also bc ncccssary to have a testing laboraton <br /> providc in-situ dcnsity tcsts to verify thc sUvctural compaction of the backfill. <br /> It should also be understood that all segmcntal b.ock walls move some small amount lateral ly <br /> ;dler construction. 1'his movement is ncccssary to achievc the passive canh pressure betwecn <br /> thc stn�cturnl lill sciil :uid Ihc i��u�rid reintiirccmcni. lutcr.�l w.dl movcmcnt ofalmut 1 perccnt <br /> uf thr ���,ill hri,�ht m:i•,� ��ccur, 1����ic�illy �lurin��. lhc tirst ��c.i� .ilier a�ntE�lelion ul�the �tiall. <br /> � <br /> I1( I� '. ��Ilc 1�73i�7 ;'.�1�)''' :�t�cnurNl�:. AV���otlin�'illc. l�'�19R0?7 (425) 27i-5p(�) �� <br /> Js <br />
The URL can be used to link to this page
Your browser does not support the video tag.