Laserfiche WebLink
PUBLIC WORKS PERMIT �OMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> 6. Connecl side sewer per City Standard #'s G01, 602, 604. <br /> 7. Connect ali rooftop downspouts to the side sewer. <br /> f 2�� <br /> ¢$. Connect rooftop downspouts to the drainage �dg�-tccll�icJcu- l.inE i h <br /> �d <br /> Braadwr�(, �Msft[L Calch Bas'rn n coi�nec��oh. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Widih },S, Depth Z' , Length�2�� ' . <br /> 10. The contractor must meet wilh the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the projecl. <br /> 11. Inslail erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everetl Standards for small parcels <br /> 13. Remo��e erosion controi measures upon completion of the project prior to final approval of the <br /> permit. <br /> 14. AII excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permilted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan �s 305A <br /> & 306 on this proposal's (rontage as directed by the Public Works Inspecto� (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Instali a Type I concrele driveway per City of Everett Slandard #307. <br /> sf$ P ve driveway irom the front property line oul to the street paving. t�n f�vfh S�frcE'�"S <br /> . ontact the Waler District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas lrap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravily flow across the pubiic right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> � �p 9�'R�Z s���sF�.,�„ to �„d�a�„�t�Y p�,� c-�ys�o�,���-ds 60% �o�� �,04- <br /> PN'Camments <br /> Z <br /> � <br />